BLD00-03651
| BLD-Final | 4/30/2001 | 5/1/2001 | 5/1/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/30/2001 at 13:47:56. Contact: ###-####.
c of c#20331 issued 5/1/2001 1:58:10 PM
|
MEC01-00471
| Rough-in | 4/30/2001 | 5/1/2001 | 5/1/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/30/2001 at 14:28:09. Contact: ###-####.
|
MEC01-00471
| Pressure Test | 4/30/2001 | 5/1/2001 | 5/1/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/30/2001 at 14:28:26. Contact: ###-####.
|
BLD01-00272
| BLD-Framing/Rough-in | 4/30/2001 | 5/1/2001 | 5/1/2001 12:00:00 AM | A | PASS |
|
|
FR -RE-INSP -- ###-#### BUSTER OFFICE ###-####
ok to cover 5/1/2001 1:57:18 PM
|
BLD01-00225
| BLD-Footing | 4/30/2001 | 5/1/2001 | 5/1/2001 12:00:00 AM | A | PART |
|
|
###-####
|
MEC01-01229
| Final | 5/1/2001 | 5/1/2001 | 5/1/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 05/01/2001 at 06:23:21. Contact: ###-####.
c/n posted 5/1/2001 1:58:42 PM
|
MEC01-00266
| Final | 4/27/2001 | 5/1/2001 | 5/1/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/27/2001 at 15:11:44. Contact: ###-####.
|
MEC01-01118
| Final | 4/30/2001 | 5/1/2001 | 5/1/2001 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 04/30/2001 at 09:07:14. Contact: ###-####.
|
MEC01-00479
| Rough-in | 5/1/2001 | 5/1/2001 | 5/1/2001 12:00:00 AM | P | CANC |
|
|
for radiant floor tubes, gas pipe & bath vents--al ###-#### r/i
|
BLD01-00409
| BLD-Framing/Rough-in | 5/1/2001 | 5/1/2001 | 5/1/2001 12:00:00 AM | P | PART |
|
|
###-#### Steve
ext. shear ok, some verbal corrections 5/1/2001 3:00:47 PM
|
BLD01-00409
| BLD-Conference | 5/1/2001 | 5/1/2001 | 5/1/2001 12:00:00 AM | P | PASS |
|
|
framing 5/1/2001 3:01:03 PM
|
BLD99-03673
| BLD-Final | 5/1/2001 | 5/1/2001 | 5/1/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 05/01/2001 at 11:18:49. Contact: ###-####.
c/n on verification of smoke seal rating in corridor vs. fire rated (astricals) also need final reports from special inspections, temp. occ. signed 5/1/2001 3:50:26 PM
|
BLD01-00386
| BLD-Energy code compliance | 4/30/2001 | 5/1/2001 | 5/1/2001 12:00:00 AM | P | PASS |
|
|
late pm if possible??-bob- ###-####
|
MEC01-01151
| Final | 5/1/2001 | 5/1/2001 | 5/1/2001 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 05/01/2001 at 06:22:50. Contact: ###-####.
|