Inspections for the day of: Wednesday, May 1, 2002.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Storey
TitleBLD-COM/RES INSPECTOR
Phone #794-9490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-00967 BLD-Energy code compliance4/30/20025/1/20025/1/2002 12:00:00 AMAPASS
###-#### tim ok to rock/need reinsp on drop soffits. 5/1/2002 4:31:14 PM
BLD02-01000 BLD-Footing4/30/20025/1/20025/1/2002 12:00:00 AMAPASS
###-#### ft ok rebar ok/ interior pad ft ok 5/1/2002 10:39:10 AM
BLD02-00981 BLD-Foundation5/1/20025/1/20025/1/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 05/01/2002 at 07:23:04. Contact: ###-####. walls and rebar ok 5/1/2002 10:49:16 AM
BLD02-00321 BLD-Foundation5/1/20025/1/20025/1/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 05/01/2002 at 07:24:14. Contact: ###-####. walls/rebar ok for cover. 5/1/2002 4:42:12 PM
BLD02-00494 BLD-Framing/Rough-in5/1/20025/1/20025/1/2002 12:00:00 AMPPASS
1. (Listed electrical boxes in walls) Membrane penetrations for electrical outlet boxes of any material are permitted, provided that such boxes are tested for use in fire-resistive assemblies and installed in accordance with the tested assembly. (1997 UBC 709.7 Exception #1)putty pad one box/ ok to cover and vervy at final.