PLM02-01125
| Sprinkler (Final) | 4/30/2002 | 5/1/2002 | 5/1/2002 12:00:00 AM | A | PASS |
|
|
backflow- todd- ###-#### work
|
PLM02-01187
| Sprinkler (Final) | 4/30/2002 | 5/1/2002 | 5/1/2002 12:00:00 AM | A | PASS |
|
|
###-####
|
PLM02-01189
| Plumbing Rough-in | 4/30/2002 | 5/1/2002 | 5/1/2002 12:00:00 AM | A | NR |
|
|
for conf-- jw-###-####
|
PLM02-01189
| Other | 5/1/2002 | 5/1/2002 | 5/1/2002 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 330 On 5/1/2002 9:53:19 AM conference on water sizing(1") to a duplex and sewer size (4")and location ok
|
PLM02-01159
| Other | 5/1/2002 | 5/1/2002 | 5/1/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 05/01/2002 at 09:42:15. Contact: ###-####. g/w conference ok existing is perty shallow but should work 5/1/2002 11:53:52 AM
|
PLM02-01182
| Water and/or Sewer | 5/1/2002 | 5/1/2002 | 5/1/2002 12:00:00 AM | P | NR |
|
|
READY AT 3:30 ###-####
|
PLM02-01196
| Plumbing Rough-in | 5/1/2002 | 5/1/2002 | 5/1/2002 12:00:00 AM | P | PASS |
|
|
JOSH ###-####
|
PLM02-01190
| Plumbing Rough-in | 4/30/2002 | 5/1/2002 | 5/1/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 04/30/2002 at 16:10:44. Contact: ###-####. r/i/ok 5/1/2002 1:55:14 PM
|
PLM01-02822
| Final | 5/1/2002 | 5/1/2002 | 5/1/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 05/01/2002 at 06:57:36. Contact: ###-####. unit 12 set wc tank, unit 13 t&p drain trapped, wh seems to be leaking 5/1/2002 2:33:08 PM
|
PLM02-01147
| Sprinkler (Final) | 5/1/2002 | 5/1/2002 | 5/1/2002 12:00:00 AM | P | PASS |
|
|
steve ###-#### backflow existing connection to main seems shallow but has been in existance for a years. final ok 5/1/2002 2:58:18 PM
|
PLM02-01112
| Plumbing Rough-in | 4/26/2002 | 5/1/2002 | 5/1/2002 12:00:00 AM | P | NR |
|
|
###-#### GEORGE oops, jumped the gun 5/1/2002 11:52:39 AM
|