Inspections for the day of: Wednesday, May 1, 2002.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-00308 BLD-Final4/30/20025/1/20025/1/2002 12:00:00 AMACANC
fn occ darwin- or janet- ###-#### or ###-#### . Called and talkede with darwin, Told him that he would need all required signatures on card, before calling for structural final. 5/1/2002 2:56:11 PM
BLD02-00124 BLD-Final4/30/20025/1/20025/1/2002 12:00:00 AMACANC
###-#### KEN FOR OCCUPANCY. This is not a building permit, this is a temporary modular which required a Zoning certificate only . a building permit is not required . A plan reveiw is also not performed on this and no structural inspections required. I have learned this this day, as I had questions pertaining to an occupacy certificate. 5/1/2002 1:05:56 PM
BLD01-02612 BLD-Framing/Rough-in4/30/20025/1/20025/1/2002 12:00:00 AMACANC
Scheduled by Inspector: 407 On 4/30/2002 5:32:34 PM
BLD01-01778 BLD-Footing5/1/20025/1/20025/1/2002 12:00:00 AMPPASS
jed ###-#### ft. garage footing. 5/1/2002 4:38:03 PM
MEC01-02399 Final5/1/20025/1/20025/1/2002 12:00:00 AMPCANC
joe digital pager ###-####. unable to do this day. I have schedualed for AM 5/2. 5/1/2002 5:20:07 PM
BLD01-02025 BLD-Final5/1/20025/1/20025/1/2002 12:00:00 AMPCANC
joe digital pager ###-#### Unable to do I have reschedualed for AM 5/2. 5/1/2002 5:20:28 PM
MEC02-01178 Pressure Test5/1/20025/1/20025/1/2002 12:00:00 AMPCANC
Scheduled by a contractor via Hello! on 05/01/2002 at 09:29:23. Contact: ###-####.already done by 411. 5/1/2002 2:43:35 PM
BLD01-00729 BLD-Framing/Rough-in5/1/20025/1/20025/1/2002 12:00:00 AMPPART
Scheduled by Inspector: 407 On 5/1/2002 1:14:39 PM lower corridor ok fire caulk penetrations ok in room sections of corridor. only, rest not yet complete..5/1/2002 2:36:41 PM 5/1/2002 2:36:59 PM
BLD01-02802 BLD-Framing/Rough-in4/30/20025/1/20025/1/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 04/30/2002 at 10:58:06. Contact: ###-####.