BLD02-00390
| BLD-Wall cover | 4/30/2002 | 5/1/2002 | 5/1/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/30/2002 at 15:38:02. Contact: ###-####.
|
BLD02-00412
| BLD-Wall cover | 4/30/2002 | 5/1/2002 | 5/1/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/30/2002 at 15:39:19. Contact: ###-####.
|
MEC02-01170
| Pressure Test | 4/30/2002 | 5/1/2002 | 5/1/2002 12:00:00 AM | A | FAIL |
|
|
###-#### on 0 5/1/2002 11:09:31 AM
|
MEC02-01170
| Rough-in | 4/30/2002 | 5/1/2002 | 5/1/2002 12:00:00 AM | A | PASS |
|
|
###-####
|
BLD01-03155
| BLD-Final | 4/30/2002 | 5/1/2002 | 5/1/2002 12:00:00 AM | A | PASS |
|
|
fn occ matt- ###-####
|
BLD02-00514
| BLD-Framing/Rough-in | 4/30/2002 | 5/1/2002 | 5/1/2002 12:00:00 AM | P | PART |
|
|
shear ###-#### fred ok to side 5/1/2002 2:03:38 PM
|
BLD02-00766
| BLD-Final | 5/1/2002 | 5/1/2002 | 5/1/2002 12:00:00 AM | P | PASS |
|
|
fn -jan- ###-####
|
BLD02-00564
| BLD-Framing/Rough-in | 5/1/2002 | 5/1/2002 | 5/1/2002 12:00:00 AM | P | FAIL |
|
|
###-#### TRAVIS cn posted 5/1/2002 3:55:12 PM
|
BLD02-00563
| BLD-Framing/Rough-in | 5/1/2002 | 5/1/2002 | 5/1/2002 12:00:00 AM | P | FAIL |
|
|
###-#### TRAVIS cn posted 5/1/2002 3:55:21 PM
|
BLD02-00530
| BLD-Framing/Rough-in | 5/1/2002 | 5/1/2002 | 5/1/2002 12:00:00 AM | P | FAIL |
|
|
###-#### TRAVIS also needs mech insp 5/1/2002 3:49:13 PM
|
BLD02-00496
| BLD-Framing/Rough-in | 5/1/2002 | 5/1/2002 | 5/1/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 05/01/2002 at 11:20:02. Contact: ###-####.
|
BLD01-03134
| BLD-Final | 5/1/2002 | 5/1/2002 | 5/1/2002 12:00:00 AM | P | PASS |
|
|
###-#### JUSTIN
|