Inspections for the day of: Thursday, May 1, 2003.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD03-00122 BLD-Aging Inspection5/1/20035/1/20035/1/2003 12:00:00 AM DONE
elec sign, no call; exp's 7-29-03 5/1/2003 10:09:36 AM
BLD02-00372 BLD-Framing/Rough-in5/1/20035/1/20035/1/2003 12:00:00 AMAPART
ISI, 4hr wall, wip 5/1/2003 2:55:42 PM
BLD03-00436 BLD-Conference5/1/20035/1/20035/1/2003 12:00:00 AMACANC
Chris
BLD02-00370 BLD-Framing/Rough-in4/29/20035/1/20035/1/2003 12:00:00 AMAPART
RANDY; Phone #: ###-#### Internet Inspection Request from: Darla Downs 4hr wall wip...need eng'r of records ok in writing for this framing 5/1/2003 2:55:18 PM
BLD00-03729 BLD-Final4/29/20035/1/20035/1/2003 12:00:00 AMAPART
BRUCE ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie...Part ,phase.3 ok for t/o, still need listing for 3hr door assy's. 3/4 hr glass installed at exterior firewall extension, ok 5/1/2003 11:35:31 AM
BLD03-00436 BLD-Conference4/30/20035/1/20035/1/2003 12:00:00 AMAPART
chris; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...w/ Jason B...no cisca-2 spec available (which is referenced in 1621 IBC.) re suspended ceilings. 5/1/2003 2:54:33 PM
BLD02-00371 BLD-Conference5/1/20035/1/20035/1/2003 12:00:00 AMAPASS
need eng'r of records ok for 4hr wall design ( by others) 5/1/2003 5:18:27 PM
BLD02-00199 BLD-Footing4/30/20035/1/20035/1/2003 12:00:00 AMPPART
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...walls at S.E. corner, pend report 5/1/2003 5:08:29 PM
BLD03-00436 BLD-Conference5/1/20035/1/20035/1/2003 12:00:00 AMPPASS
Chris, Install grid per " seismic C " specs...floating. 5/1/2003 2:56:26 PM
BLD02-00372 BLD-Framing/Rough-in5/1/20035/1/20035/1/2003 12:00:00 AMPPART
Wip, 4hr wall to 3rd fl. 5/2/2003 2:39:52 PM
BLD02-02915 BLD-Final5/1/20035/1/20035/1/2003 12:00:00 AMPPASS
JEFF; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD02-00369 BLD-Framing/Rough-in5/1/20035/1/20035/1/2003 12:00:00 AMPPART
Leighton; prelim insp only; verify all shear wall anchor bolts, stud sizing as correct, 5/1/2003 4:42:36 PM
BLD02-00371 BLD-Framing/Rough-in5/1/20035/1/20035/1/2003 12:00:00 AMPPART
4hr wall, need eng'rs ok for framing design...WIP to 3rd fl level 5/1/2003 5:19:48 PM