Inspections for the day of: Thursday, May 1, 2003.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRick Jackson
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR03-00185 INSP-Sprinkler Rough-in4/30/20035/1/20035/1/2003 12:00:00 AMAPART
roland; Phone #: ###-#### Internet Inspection Request from: Barbara Moore met with Roland and gave correction notice to move hangers to top of joists and to add retaining straps; the approved plans show the west 3 inch main going through this space to the north but the main actually stops within the Rave space; called Bill Alexander about this and the main is supposed to go through to the space to the north 5/1/2003 9:48:23 AM
BLD00-03729 FIRE-Final Inspection4/29/20035/1/20035/1/2003 12:00:00 AMAPART
BRUCE ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie phase 4 okay to occupy; signatures are on the occupancy card under phase 3 5/1/2003 2:29:45 PM . 5/1/2003 2:29:49 PM
FIR03-00151 INSP-Alarm Testing4/30/20035/1/20035/1/2003 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 4/30/2003 at 1:34:53 PM. Contact: ###-####. tested duct detectors and those tested shut units off 5/1/2003 3:46:59 PM
BLD03-00231 FIRE-Final Inspection5/1/20035/1/20035/1/2003 12:00:00 AMPPASS
kenny; Phone #: ###-#### Internet Inspection Request from: Annette Moore per plan review notes: no exit signs required as exits are obvious; no separation required for storage room 5/1/2003 2:26:00 PM
FIR02-00456 INSP-Final Inspection5/1/20035/1/20035/1/2003 12:00:00 AMPPASS
BLD02-02303 FIRE-Final Inspection5/1/20035/1/20035/1/2003 12:00:00 AMPFAIL
exit signs not working in lobby exit and door to lobby 5/1/2003 3:47:32 PM