Inspections for the day of: Monday, May 1, 2006.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR05-00822 FIR-Aging Inspection5/1/20065/1/20065/2/2006 11:46:53 AM NR
work in progess. resubmittals received last week
BLD04-03025 FIRE-Conference5/1/20065/1/20065/1/2006 4:28:04 PMPDONE
I spoke to the general contractor about getting the damaged fire hydrant that is located in the southeast corner of the project repaired as soon as possible. He stated that he had already started the process.
BLD05-02855 FIRE-Final Inspection5/1/20065/1/20065/1/2006 3:52:28 PMPPASS
Life safety finaled.
FIR05-00901 INSP-Sprinkler Rough-in4/28/20065/1/20065/1/2006 2:56:00 PMAPART
Sprinkler inspection was for main and branchline rough-in only. No piping in the stairwells between columns 1-2 and 10-11 has not been installed or inspected yet. Piping for the most part is ok. The deficiencies have been marked on the city approved plans. The deficiencies include missing retaining straps, overspaced earthquaking, on the first floor riser nipples feeding branchlines where the plans shown supplies from the crosses and on the third floor all of the pipe hangers are attached to the bottom of the open web steel trusses (need engineers approval)
FIR05-00644 INSP-Sprinkler Rough-in4/28/20065/1/20065/1/2006 2:17:04 PMAPASS
Per the sprinkler contractor the pockets behind the elevator shaft will be filled with insulation. Revised hydraulic calculations have been provided and field verified by me for the addition of one upright sprinkler head in the fourth floor attic system remote area. The new node point was 400. The north/south will is ok to cover. No inspection has been done on the east/west wing.
FIR06-00210 INSP-Sprinkler Rough-in4/28/20065/1/20065/1/2006 10:54:44 AMAPASS
Per David, the sprinkler fitter there is to be a ceiling below the mechanical obstructions in the mechanical room and a full height door is to be installed for the shower. The sidewall head in the garage has been relocated. Sprinkler piping is ok to cover.
BLD06-00183 FIRE-Final Inspection4/28/20065/1/20065/1/2006 9:35:21 AMAPASS
fire life safety finaled