ELE07-02473
| DOC - Permit Expired | 5/1/2009 | 5/1/2009 | 5/1/2009 4:24:14 PM | P | PASS |
|
|
no activity, ok to doc expire
|
ELE09-00733
| Permanent Service | 5/1/2009 | 5/1/2009 | 5/1/2009 4:20:22 PM | P | PASS |
|
|
p/s u/g n ok
|
ESC09-00134
| General Inspection | 5/1/2009 | 5/1/2009 | 5/1/2009 4:19:03 PM | P | FAIL |
|
|
site conditions noted per 450
|
ESC09-00103
| General Inspection | 5/1/2009 | 5/1/2009 | 5/1/2009 4:17:06 PM | P | PASS |
|
|
looked ok
|
ESC08-00179
| General Inspection | 5/1/2009 | 5/1/2009 | 5/1/2009 4:16:17 PM | P | PASS |
|
|
looked ok
|
ELE09-00728
| Electrical Rough-In | 5/1/2009 | 5/1/2009 | 5/1/2009 4:15:40 PM | P | PASS |
|
|
Jim Phone #: ###-#### ok to cover u/g only, no esc this project
|
ELE09-00730
| Electrical Rough-In | 5/1/2009 | 5/1/2009 | 5/1/2009 3:48:02 PM | P | PASS |
|
|
Provide underground inspection. Phone #: ###-#### Internet Inspection Request from: Spencer Mclean ok to cover u/g only, no esc this project
|
ELE07-02422
| Final | 5/1/2009 | 5/1/2009 | 5/1/2009 3:30:26 PM | P | PASS |
|
|
Perry Phone #: ###-#### met owner, ok to final, no esc this project
|
ELE09-00695
| Permanent Service | 5/1/2009 | 5/1/2009 | 5/1/2009 2:19:22 PM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Kerri Hamilton p/s, exst meter pak, n, ok, no esc this project
|
ELE09-00695
| Electrical Rough-In | 5/1/2009 | 5/1/2009 | 5/1/2009 2:18:46 PM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Kerri Hamilton ric ok, no esc this project
|
ELE08-02167
| Electrical Rough-In | 5/1/2009 | 5/1/2009 | 5/1/2009 1:18:05 PM | P | PART |
|
|
ceiling inspection//Andy ###-#### ok to cover 3 north east ceilings only
|
ELE07-02422
| Electrical Rough-In | 4/30/2009 | 5/1/2009 | 5/1/2009 10:33:33 AM | A | PASS |
|
|
Perry- after 10- go around back to shop Phone #: ###-#### ric shop only ok, no esc this project
|
ELE09-00733
| Electrical Rough-In | 5/1/2009 | 5/1/2009 | 5/1/2009 9:46:27 AM | P | PASS |
|
|
Tom Phone #: ###-#### called, left message, left survey, NEC 300.4(A) shall provide nailplates for holes less than 1 1/4" from edge od framing members-garage door west side inside, 314.20 in walls of combustible material, box shall be flush with or project therefrom,314.17 shall provide abrasion for nm cable entering box - east outside light at garage door
|
ELE09-00395
| Electrical Rough-In | 4/30/2009 | 5/1/2009 | 5/1/2009 9:02:21 AM | A | PASS |
|
|
This is a Electric Rough inspect for Bldg B. The contact is Brian Cornell. Phone #: ###-#### Internet Inspection Request from: Richard Montgomery called contractor, ric walls and hard lids only ok, no esc this project
|
ELE09-00679
| Final | 4/30/2009 | 5/1/2009 | 5/1/2009 8:10:07 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Lee VanSchoiack called contractor, ok to final, no esc this project
|