FIR04-00349
| INSP-Conference | 4/30/2009 | 4/30/2009 | | P | |
|
|
Jeff; Phone ###-####
|
FIR08-00832
| INSP-Sprinkler Rough-in/Hydro | 4/29/2009 | 5/1/2009 | 5/1/2009 4:02:31 PM | A | PASS |
|
|
The sheet rock can be installed on the bottom of the trusses in the 1st, 2nd and 3rd floor corridors of building "C"
|
FIR07-01032
| INSP-Sprinkler Rough-in | 4/30/2009 | 5/1/2009 | 5/1/2009 4:01:04 PM | A | PASS |
|
|
This was for a conference in the shower areas dealing with pendant sprinkler coverage and curtains.
|
BLD09-00613
| FIRE-Final Inspection | 4/30/2009 | 5/1/2009 | 5/1/2009 9:51:09 AM | A | PART |
|
|
A temporary occupancy was given for the fire issues. See the city approved review notes for the corrections that are needed. That include providing the suite number, repair or remove the exit sign and emergency light. Also remove the exit sign that directs people to the new tenant space 180.
|
BLD09-00615
| FIRE-Final Inspection | 4/30/2009 | 5/1/2009 | 5/1/2009 9:49:59 AM | A | PART |
|
|
A temporary occupancy was given for the fire issues. See the city approved review notes for the corrections that are needed. That include providing the suite number, provide a fire extinguisher and repair or remove the exit sign.
|