Inspections for the day of: Friday, May 1, 2009.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC09-00072 Site Final4/28/20095/1/20095/6/2009 9:08:31 AMPPASS
ESC09-00164 General Inspection4/30/20095/1/20095/1/2009 4:02:17 PMADONE
Spoke with RP over issues that can not occur. " No discharging of TURBID water into the Boise River". Also told the RP to keep an eye on all discharge points into the River. As of 3:00 pm on 5/1/09 there are four.
Pumps will be running trough out the weekend. But was told that no excavating will occur this wekend from 5/2/09 to 5/3/09. Will begin to set sand traps on Monday 5/4/09. Will re-inspect on 5/4/09 AM
ESC08-00491 BMP Violation4/28/20095/1/20095/1/2009 2:13:12 PMAPART
ESC09-00207 Site Preparation5/1/20095/1/20095/1/2009 2:12:59 PM PASS
ESC07-00987 BMP Violation4/28/20095/1/20095/1/2009 1:31:47 PMAPART
Mortor mix area by the job trailer has been cleaned up and re located at the south end of project area. Told Rp to contain the area of where the mixing will be occuring. Also was told that a mid day street sweep will occur within the parking lot area of all entrance points to the project and a trash pick will occur also.
ESC08-01028 Site Preparation4/28/20095/1/20095/1/2009 11:08:36 AMAPASS
ESC09-00201 Tracking Control4/29/20095/1/20095/1/2009 10:56:03 AMAPASS