ESC12-00328
| Site Preparation | 4/30/2012 | 4/30/2012 | | | |
|
|
|
MIS12-00111
| MEC-Conference | 4/30/2012 | 5/1/2012 | 5/1/2012 5:00:26 PM | A | NR |
|
|
Orlando to check out kitchen equipment-new occupant moving into this space Phone #: ###-####...called Orlando at 10:00...no return call
|
MEC12-01306
| Rough-in | 5/1/2012 | 5/1/2012 | 5/1/2012 4:59:43 PM | P | PART |
|
|
OLEG Phone #: ###-####...duct blaster ok..20lb gas ok...need make-up air for gas cook-top
|
MEC12-01330
| Final | 4/30/2012 | 5/1/2012 | 5/1/2012 4:58:37 PM | P | PASS |
|
|
installer scott t ###-#### Phone #: ###-#### >> Inspection requested via web by Dustin Rich
|
MEC12-01316
| Rough-in | 4/28/2012 | 5/1/2012 | 5/1/2012 4:02:32 PM | P | PASS |
|
|
>> Inspection requested via web by Mike Almanza
|
MEC12-01342
| Pressure Test | 5/1/2012 | 5/1/2012 | 5/1/2012 4:02:12 PM | P | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Lori Michel...20lb u/g from meter to future heating equipment in the office
|
MEC12-01112
| Final | 4/30/2012 | 5/1/2012 | 5/1/2012 3:14:15 PM | P | PASS |
|
|
Scheduled final for 5/1/2012 3-5. Ronald Blakely can be reached at ###-#### if needed. Phone #: ###-#### >> Inspection requested via web by Ernestina Garcia
|
MEC12-01323
| Rough-in | 5/1/2012 | 5/1/2012 | 5/1/2012 2:33:08 PM | P | FAIL |
|
|
Phone #: ###-#### >> Inspection requested via web by randy calkins...covered with sheetrock..told owner to uncover and recall
|
MEC12-01329
| Rough-in | 4/30/2012 | 5/1/2012 | 5/1/2012 11:23:52 AM | A | PART |
|
|
Duct blaster test for 11:00 am. Please call with any questions ot concerns. Phone #: ###-#### >> Inspection requested via web by Jennifer Roy...duct blaster ok...20lb gas ok...need 24" wide unobstructed walk-way to front of furnace with 30" working space...need light switch at attic access
|
MEC12-01333
| Final | 4/30/2012 | 5/1/2012 | 5/1/2012 11:22:18 AM | A | PASS |
|
|
elizabeth is renter, this is her phone # ###-####, we installed 4/30 Phone #: ###-#### >> Inspection requested via web by Dustin Rich
|
MEC12-01302
| Rough-in | 4/30/2012 | 5/1/2012 | 5/1/2012 10:32:20 AM | A | PASS |
|
|
rough in for class two hood system. Call Dave Phone #: ###-#### >> Inspection requested via web by Dave DeChambeau
|
MEC12-01183
| Pressure Test | 4/30/2012 | 5/1/2012 | 5/1/2012 10:00:55 AM | A | NR |
|
|
Please complete a pressure test inspection. If there are any questions/concerns, please contact Eric @ ###-#### (EFG 30/04) Phone #: ###-#### >> Inspection requested via web by Jennifer Bryan...called eric
|
MEC12-01183
| Rough-in | 4/30/2012 | 5/1/2012 | 5/1/2012 10:00:02 AM | A | NR |
|
|
Please complete a rough-in inspection. If there are any questions/concerns, please contact Eric @ ###-#### (EFG 30/04) Phone #: ###-#### >> Inspection requested via web by Jennifer Bryan..no duct blaster scheduled..called eric
|
MEC11-03963
| Rough-in | 5/1/2012 | 5/1/2012 | 5/1/2012 9:57:30 AM | A | PART |
|
|
Phone #: ###-#### >> Inspection requested via web by AMANDA FARNSWORTH...ok to cover 3rd floor laundry..common area..utility closet
|