Inspections for the day of: Thursday, May 1, 2014.
Number of inspections: 20
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC13-01159 BMP Violation5/1/20145/1/20145/1/2014 3:06:54 PMPPASS
Follow up on verbal CN issued on Tuesday 4/28

More rock provided at construction entrance. Small amount of trackout. No major dust issues at time of inspection. Permit clearly posted at entrance. Site is back in compliance.
ESC14-00315 Random Inspection5/1/20145/1/20145/1/2014 2:29:52 PMPPART
Construction entrance installed but trucks using dirt road to access site from the West. This is due to the ACHD project on 5 Mile Road to the east making it difficult to turn onto to the road safely.

Dirt road use will be discontinued or construction rock will be placed on it.

Verbal notice to monitor condition of road and keep up dust controls as the warmer weather approached. Minimal trackout, permit posted, RP on site.
ESC13-00768 General Inspection5/1/20145/1/20145/1/2014 2:24:51 PM CANC
postponed to following week. No complaints or issues reported from Elevation Ridge
ESC13-00797 Aging Inspection5/1/20145/1/20145/1/2014 2:23:50 PM PASS
ESC13-00797 DOC - Permit Finaled5/1/20145/1/20145/1/2014 2:23:38 PMPPASS
House complete and landscaped. All permits finaled. ESC conditions satisfied.
ESC14-00082 Conference5/1/20145/1/20145/1/2014 2:04:24 PMPCANC
Follow up phone call from RP Eric from Arrow construction to confirm placement of the DI protection on MS4 on Bird Street.
ESC12-00036 General Inspection5/1/20145/1/20145/1/2014 1:44:54 PM PASS
ESC13-00910 DOC - Permit Finaled5/1/20145/1/20145/1/2014 12:38:08 PMPPASS
ESC13-00910 Aging Inspection5/1/20145/1/20145/1/2014 12:36:54 PM PASS
Renovation and patio addition complete and surrounding areas stabilized. ESC conditions satisfied.
ESC12-01032 General Inspection5/1/20145/1/20145/1/2014 11:32:02 AM PASS
Finaled.
ESC12-01032 DOC - Permit Finaled5/1/20145/1/20145/1/2014 11:31:48 AMPPASS
No activity on BLD in over 180 days. No ESC issues. ESC permit expired. No further inspections.
ESC14-00154 General Inspection5/1/20145/1/20145/1/2014 11:23:05 AM NR
No activity, no BMPs installed yet. Need to schedule a site prep when ready.
ESC13-00749 General Inspection5/1/20145/1/20145/1/2014 11:17:49 AM PASS
ESC09-00352 General Inspection5/1/20145/1/20145/1/2014 11:11:36 AM PASS
No changes Marianne Williams park. Need to get with Brighton and close this permit and prepare for next phases to the west of the park.
ESC13-00755 Site Preparation5/1/20145/1/20145/1/2014 10:58:38 AMPCANC
Data entry error. Please disregard.
ESC13-00793 Conference5/1/20145/1/20145/1/2014 10:43:09 AMACANC
ESC13-00793 Conference5/1/20145/1/20145/1/2014 10:28:33 AMPPASS
Please see ESC13-00755 for details on conference regarding previous day's correction notice.

Site is now in compliance.
ESC13-00755 Conference5/1/20145/1/20145/1/2014 10:26:41 AMAPASS
Conference organized at Terraces' job site Main Office to discuss trackout issues from site and the Correction Notice (CN) issued on 4/30/2014.


Attendees:

Petra Inc: Brett Myron, John Low, JC Murray
City of Boise ESC: Evan Jenkins, Andy Long

Syman: Don Reynolds (SWPPP inspector)
All sub-contractor supervisors on the job



Summary: Petra organized a meeting at 8:30 AM on 5/1 to allow the ESC division to discuss track out issues with subcontractors on site. After the meeting we discussed plans to control trackout going forward and the corrections already made/in-progress.



Corrections made:

1. Round-a-bout on Lysted and entrance area on Council Springs have been swept and are in good condition.

2. Accumulated sediment in gutters has been scooped and removed manually.

3. Construction entrances to main site have been restored and lengthened, the staging yard entrance will be improved once more rock arrives

4. Subcontractors were made aware of the issue of trackout and how they can help reduce trackout.



Plans going forward:

1. The west entrance is only to be used for entry only in effort to prevent trackout onto Council Springs. The roundabout will be the main exit with the more serious trackout controls in place.
2. Street sweeping to occur 2 x daily.

3. A crew has been specifically designated to sweep and shovel the gutters where sediment accumulates.

4. Syman Co. will continue to make SWPPP inspections and email the stormwater team the corrections necessary (JC, Preston, Brett, John)
5. Boise ESC will always be sure to email entire stormwater team in addition to phone calls or conversations so everyone is aware of Correction Notices issued so they may be properly responded to.

With the corrective actions listed above and conference organized, the Terraces of Boise site is now currently in compliance.

Going forward the two ESC permits for Terraces will be:


ESC13-00755 : main site

ESC13-00793: staging/laydown yard
ESC13-00069 was issued prior to these permits and will be closed to simplify record keeping and communication. Note: This permit covered the acreage fees for the entire main site.
ESC13-00069 DOC - Permit Finaled5/1/20145/1/20145/1/2014 10:19:10 AMPPASS
No further inspections required on this permit. Please reference ESC13-00755 and ESC13-00793 for inspection activity at the Terraces.
ESC13-00230 General Inspection5/1/20145/1/20145/1/2014 9:56:19 AM PASS
River Heights #5 in decent condition. Some minor trackout. Cement washout and DI bags are adequately maintained. Will need to bolster the construction entrance that has been desiganted near the entrance.