ELE09-02323
| ELE-Aging Inspection | 5/1/2015 | 5/1/2015 | 5/1/2015 3:44:55 PM | | DONE |
|
|
still under construction
|
ELE13-03438
| Electrical Rough-In | 4/28/2015 | 5/1/2015 | 5/1/2015 3:38:52 PM | P | PASS |
|
|
Contact: Jeremiah Goins. Would like 2:00 or close if possible please Phone #: ###-#### Inspection requested via web by Deb Gooden rough-in ok exterior underground
|
ELE15-00820
| Final | 4/30/2015 | 5/1/2015 | 5/1/2015 3:05:46 PM | A | PASS |
|
|
Casey Phone #: ###-#### correction done, final ok
|
ELE15-00699
| Electrical Rough-In | 5/1/2015 | 5/1/2015 | 5/1/2015 3:04:52 PM | P | PASS |
|
|
This rough in inspection is for the line side of the solar system. They told me we needed to have you inspect before they could call in their final. Please call Ryan with any questions. Thank you Phone #: ###-#### Inspection requested via web by Thomas Jenkins rough-in ok solar connection.
|
ELE15-01268
| Final | 5/1/2015 | 5/1/2015 | 5/1/2015 2:16:13 PM | P | NR |
|
|
Brent Phone #: ###-#### Not ready at this time,ulitity power not connected
|
ELE15-01268
| Permanent Service | 5/1/2015 | 5/1/2015 | 5/1/2015 2:15:09 PM | P | PASS |
|
|
Brent Phone #: ###-#### p/s o/h n ok
|
ELE15-01271
| Electrical Rough-In | 5/1/2015 | 5/1/2015 | 5/1/2015 2:01:19 PM | P | PASS |
|
|
Steve Phone #: ###-#### rough-in ok cover basement
|
ELE15-01148
| Final | 5/1/2015 | 5/1/2015 | 5/1/2015 1:38:26 PM | P | PASS |
|
|
Paul is the contact. Phone #: ###-#### Inspection requested via web by Buster Bowen final ok
|
ELE09-01597
| Final | 5/1/2015 | 5/1/2015 | 5/1/2015 10:32:20 AM | A | PASS |
|
|
Listing and labeling of industrial equipment no longer required do to new house bill, final ok
|
ELE15-01230
| Final | 4/30/2015 | 5/1/2015 | 5/1/2015 10:28:41 AM | A | NR |
|
|
Rough in and trim complete please call with any questions Phone #: ###-#### Inspection requested via web by Brad Baker not ready for final at this time
|
ELE15-01230
| Electrical Rough-In | 5/1/2015 | 5/1/2015 | 5/1/2015 10:28:36 AM | A | PASS |
|
|
Rough in and trim complete please call with any questions Phone #: ###-#### Inspection requested via web by Brad Baker rough-in ok attached garage
|
ELE15-01130
| Permanent Service | 4/30/2015 | 5/1/2015 | 5/1/2015 9:39:29 AM | P | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Bryan Atkins Inspection cancelled from web by: Bryan Atkins
|
ELE15-01147
| Final | 4/29/2015 | 5/1/2015 | 5/1/2015 9:21:43 AM | A | FAIL |
|
|
final on lighting retrofit Phone #: ###-#### Inspection requested via web by Tim Dunlop sercure MC/flex to chain, install KO plugs
|
ELE15-01236
| Permanent Service | 4/30/2015 | 5/1/2015 | 5/1/2015 9:07:21 AM | A | PASS |
|
|
Inspection to reenergize service. Call Dave at ###-#### for blue lockbox code. Phone #: ###-#### Inspection requested via web by Robert Schroder p/s u/g rec ok one neutral conductor per lug before final
|