Inspections for the day of: Friday, May 1, 2015.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorKatie Marron
TitleFIRE INSPECTOR
Phone #395-7809
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD14-03129 FIRE-Final Inspection4/30/20155/1/20155/4/2015 10:38:59 AMAFAIL
The following items need to be corrected. Door hardware on the three exit doors to be replaced with keyed bolt and non latching ada compliant hardware. An additional exit sign to be installed in basement per city approved plans. A second fire extinguisher to be provided and hung per note 11 on permit fire code review. Both extinguishers to be inspected and tagged by a certified inspection company.
NAF15-00001 INSP-Sprinkler Rough-in/Hydro4/30/20155/1/20155/1/2015 4:21:46 PMPPART
Hydrostatic test completed satisfactory. Completed rough-in inspection. Verified seismic bracing, retaining straps and riser/aux drain complete.
FIR14-00912 INSP-Sprinkler Rough-in/Hydro5/1/20155/1/20155/1/2015 3:19:56 PMPPART
Hydrostatic pressure test complete all three risers/systems. Basement system failed first attempt. Leaking vic in main area was adjusted/tightened on the spot. Basement system was pumped back up for a second test and passed.
FIR15-00262 INSP-Sprinkler Rough-in/Hydro5/1/20155/1/20155/1/2015 1:35:23 PMPPART
Rough-in inspection pass. Ok to cover soffit.
BLD14-03140 FIRE-Final Inspection4/30/20155/1/20155/1/2015 11:35:25 AMAPASS
Fire life safety pass
BLD15-00889 FIRE-Final Inspection4/30/20155/1/20155/1/2015 10:31:58 AMAPASS
Fire life safety pass pending update of three fire extinguishers. Fire extinguisher annual inspection expired Mar 2014. Tenant has fire extinguisher company scheduled for today. Bldg inspector please verify.
FIR14-00529 INSP-Final Inspection4/29/20155/1/20155/1/2015 9:30:58 AMANR
FDC is installed. Still missing alarm monitoring, emergency lights, and heating per pervious comments. Additionally 24 hr air test passed on risers 1, 2, 3. Riser 4 did not pass dropped from 43.5 to 40 psig. No inspector test flow has been completed to date.
FIR15-00154 INSP-Sprinkler Rough-in4/30/20155/1/20155/1/2015 8:50:10 AMAPASS
Rough-in pass. Installtion of new pendant drops in warehouse and two in office/restroom completed satisfactory.