ELE16-01134
| Electrical Rough-In | 5/1/2017 | 5/1/2017 | 5/2/2017 7:30:27 AM | P | PASS |
|
|
We are requesting a ceiling inspection in the lobby and a ceiling and corridor inspection on west level 10. Our contact is Bobby at ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Clint Tate 10th floor west rooms and corridor minus bathrooms and lobby ceilings ok cover
|
ELE17-01226
| Electrical Rough-In | 5/1/2017 | 5/1/2017 | 5/1/2017 1:31:23 PM | P | PASS |
|
|
Phone #: ###-#### walls only ok cover
|
ELE17-00508
| Final | 5/1/2017 | 5/1/2017 | 5/1/2017 12:43:05 PM | P | PASS |
|
|
Garage is open Phone #: ###-#### Inspection requested via web by Kevin Heideman Final ok
|
ELE17-01255
| Temporary Service | 5/1/2017 | 5/1/2017 | 5/1/2017 12:38:09 PM | P | PASS |
|
|
t/s o/h n ok
|
ELE17-01232
| Final | 4/27/2017 | 5/1/2017 | 5/1/2017 10:34:23 AM | A | PASS |
|
|
Please Call Jimmy Romero. Phone #: ###-#### Inspection requested via web by Kevin Perez Contractor verified type mc cable was not live. Underground ok cover final for sign ok
|
ELE17-00441
| Final | 4/28/2017 | 5/1/2017 | 5/1/2017 9:13:57 AM | A | FAIL |
|
|
If you have any questions, please call Aaron at ###-####. The lockbox is "eng" Thank you Phone #: ###-#### Inspection requested via web by Clay Morgan 210.12 AFCI protetion required for bedrooms 406.6 Faceplates required 422.30@11.25 lockout required for dishwasher
|
ELE17-01250
| Final | 4/28/2017 | 5/1/2017 | 5/1/2017 8:59:03 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Louis Keller Final for solar ok
|
ELE17-01251
| Final | 4/28/2017 | 5/1/2017 | 5/1/2017 8:58:19 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Louis Keller Final for solar ok
|
ELE16-03265
| ELE-Request for Extension | 4/28/2017 | 5/1/2017 | 5/1/2017 8:13:52 AM | A | PASS |
|
|
Dana Phone #: ###-#### Extension for 180 days, will return to work once weather allows and injury's are healed.
|