BLD18-00350
| FIRE-Final Inspection | 5/1/2018 | 5/1/2018 | 5/1/2018 2:25:40 PM | P | PASS |
|
|
Life safety passed
Paul Phone #: ###-####
|
FIR18-00271
| INSP-Final Inspection | 5/1/2018 | 5/1/2018 | 5/1/2018 1:43:08 PM | P | PASS |
|
|
Permit finaled
|
BLD17-04218
| FIRE-Final Inspection | 4/30/2018 | 5/1/2018 | 5/1/2018 1:42:13 PM | A | PART |
|
|
A temporary is being given for the life safety until the exiting has been corrected. Plans are currently in review but a temporary exiting plan has been approved and implemented. Need the sidewall sprinkler heads installed when canopy is built.
Justin Phone #: ###-####
|
FIR18-00313
| INSP-Final Inspection | 5/1/2018 | 5/1/2018 | 5/1/2018 12:18:57 PM | P | PASS |
|
|
Permit finaled
ken Phone #: ###-####
|
BLD17-02384
| FIRE-Final Inspection | 4/30/2018 | 5/1/2018 | 5/1/2018 12:18:07 PM | P | PASS |
|
|
Life safety passed
Bill Phone #: ###-####
|
FIR18-00071
| INSP-Final Inspection | 4/30/2018 | 5/1/2018 | 5/1/2018 11:38:37 AM | A | PASS |
|
|
Permit finaled
Peter Naumov, Crane Alarm Phone #: ###-#### Inspection requested via web by Laura Tyson
|
NAF18-00050
| INSP-Sprinkler Rough-in/Hydro | 4/30/2018 | 5/1/2018 | 5/1/2018 11:35:53 AM | A | PASS |
|
|
The underground supply piping hydro test passed.
UG Hydro Please coordinate with Troy nelson Phone #: ###-#### Inspection requested via web by Christophe Wilson
|
FIR17-00259
| INSP-Final Inspection | 4/30/2018 | 5/1/2018 | 5/1/2018 9:46:39 AM | A | FAIL |
|
|
Provide as-builts with the candella changes and the revised zones. Provide adjustment for the tamper switches, provide supervisory signal to the monitoring agency.
6:30 am inspection // Rase Phone #: ###-####
|
FIR18-00172
| INSP-Final Inspection | 5/1/2018 | 5/1/2018 | 5/1/2018 9:45:34 AM | A | PASS |
|
|
Permit finaled
|
FIR18-00313
| INSP-Alarm Testing | 5/1/2018 | 5/1/2018 | 5/1/2018 12:00:00 AM | P | CANC |
|
|
Ken Phone #: ###-####
|