BLD17-04627
| BLD-Ceiling Grid Inspection | 5/1/2019 | 5/1/2019 | 5/1/2019 3:39:40 PM | P | FAIL |
|
|
JC-bldg E west side 12 units, drop ceilings cover, fire caulking Phone #: ###-####
|
BLD19-00059
| BLD-Wall Bracing | 5/1/2019 | 5/1/2019 | 5/1/2019 3:13:15 PM | P | FAIL |
|
|
Sam Phone #: ###-#### c/n on site
|
BLD19-00025
| BLD-Framing/Rough-in | 5/1/2019 | 5/1/2019 | 5/1/2019 2:46:38 PM | P | PASS |
|
|
Venice Phone #: ###-#### finsh mech c/n
|
BLD19-00198
| BLD-Energy code compliance | 5/1/2019 | 5/1/2019 | 5/1/2019 2:38:08 PM | P | PART |
|
|
Bobby- please go late afternoon. Phone #: ###-#### framing ok// rim joist at stair not insulated
|
BLD18-00999
| BLD-Final | 4/30/2019 | 5/1/2019 | 5/1/2019 2:15:57 PM | P | PART |
|
|
Phone #: ###-#### Inspection requested via web by Joel Hartman need sign offs pw/zone/achd
|
BLD18-03471
| BLD-Framing/Rough-in | 4/30/2019 | 5/1/2019 | 5/1/2019 1:53:53 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Joe Perdew
|
BLD18-03667
| BLD-Wall Bracing | 4/30/2019 | 5/1/2019 | 5/1/2019 12:18:07 PM | A | FAIL |
|
|
Joe Phone #: ###-#### over driven renail
|
BLD18-03667
| BLD-Framing/Rough-in | 4/30/2019 | 5/1/2019 | 5/1/2019 12:17:13 PM | A | FAIL |
|
|
Joe Phone #: ###-#### c/n 602 1 hr from bothsides provide engineering to resolve to planreview.
|
BLD15-04034
| BLD-Aging Inspection | 5/1/2019 | 5/1/2019 | 5/1/2019 10:39:35 AM | | DONE |
|
|
|
BLD15-04034
| DOC - Permit Finaled | 5/1/2019 | 5/1/2019 | 5/1/2019 10:38:57 AM | P | PASS |
|
|
425
|
BLD19-01056
| BLD-Final | 4/29/2019 | 5/1/2019 | 5/1/2019 10:31:25 AM | A | FAIL |
|
|
Daryl Phone #: ###-#### need handrail
|
BLD18-01593
| BLD-Final | 4/30/2019 | 5/1/2019 | 5/1/2019 10:02:14 AM | A | PASS |
|
|
Kevin Phone #: ###-####
|