Inspections for the day of: Wednesday, May 1, 2019.
Number of inspections: 24
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJack Reynolds
TitleMEC INSPECTOR
Phone #208-803-2395
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC19-01772 Final4/30/20195/1/20195/1/2019 4:03:53 PMPNH
INSTALLER JAROD ###-#### Phone #: ###-#### Inspection requested via web by Aaron Alandt
- no access to home
MIS19-00105 MEC-Conference4/24/20195/1/20195/1/2019 3:57:55 PMAPASS
Re inspection of back room being used as a nail station downstairs SW corner.
- At follow up inspection of back room downstairs being used as a nail station owner looks to have pulled worker out of room. Room had a few ceiling tiles open and nail station furniture still in place. It does look like some extra items have been put in there for storage aswell. Will follow up in a few week
MEC19-00971 Pressure Test5/1/20195/1/20195/1/2019 3:36:46 PMPPASS
John with Bakers Plumbing ###-#### any questions call
-100lb hydronics test for chiller ok
MEC19-01700 Rough-in5/1/20195/1/20195/1/2019 3:00:36 PMPFAIL
Olege Phone #: ###-####
- dryer vent in room 102 still not finished
MEC19-01794 Rough-in5/1/20195/1/20195/1/2019 2:22:32 PMPFAIL
If possible to do after 1 pm please.

Thank you Phone #: ###-#### Inspection requested via web by Teresa Costello
- supply base can in crawl still needs insulated
- fresh air duct needs to be a 6" not a 4"
MEC19-01804 Final5/1/20195/1/20195/1/2019 1:59:37 PMPNR
Latter in the day would be best. We will need a flue pressure test also. Thanks! Phone #: ###-#### Inspection requested via web by Floyd Floyd Peek
- not ready
- flue test ok
MEC19-01804 Pressure Test5/1/20195/1/20195/1/2019 1:59:12 PMPPASS
Latter in the day would be best. We will need a flue pressure test also. Thanks! Phone #: ###-#### Inspection requested via web by Floyd Floyd Peek
- 5lb flue pressure test ok
- new B vent for water heater ok
MEC19-01526 Final5/1/20195/1/20195/1/2019 1:36:53 PMPPASS
Inspection requested via web by Marisa Hone
- furnace only co ok
MEC19-01016 Pressure Test4/30/20195/1/20195/1/2019 12:06:31 PMAPASS
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth
- 20lb gas pressure test on entire system ok
MEC19-01774 Rough-in4/30/20195/1/20195/1/2019 11:35:13 AMACANC
Please call Danny, thank you. Phone #: ###-#### Inspection requested via web by Rhonda Marcum-building eprmit still not picked up as of 10:30
- contractor will reschedule at a later date when ready
MEC19-01777 Rough-in4/30/20195/1/20195/1/2019 11:34:31 AMAPASS
seal inspection
Phone #: ###-#### Inspection requested via web by Brandon Sorensen
- duct seal ok
- need to see 3/4 condensate line ran for ductless split
- duct work above bathroom hard lid ok for cover
- rtu 1 will have return air transfers ran for offices at trim
MEC19-01786 Rough-in4/30/20195/1/20195/1/2019 10:42:55 AMAPASS
Please call the number provided when on the way. Phone #: ###-#### Inspection requested via web by Steve Bunch
- range venting ok
- R/I ok
MEC19-01786 Pressure Test4/30/20195/1/20195/1/2019 10:41:45 AMAPASS
Please call the number provided when on the way. Phone #: ###-#### Inspection requested via web by Steve Bunch
- 20lb gas pressure test ok for range
MEC19-01794 Rough-in4/30/20195/1/20195/1/2019 10:19:58 AMAFAIL
Phone #: ###-#### Inspection requested via web by Teresa Costello
- need stamped Man J onsite
- exhaust fan in master room needs sealed
- floor boots on the 2nd floor need sealed
- line set in crawl needs supported
- supply trunk in crawl needs insulated
MEC19-01794 Pressure Test4/30/20195/1/20195/1/2019 10:18:22 AMAPASS
Phone #: ###-#### Inspection requested via web by Teresa Costello
- 20lb gas pressure test ok
- tagged meter location
MEC19-00971 Pressure Test5/1/20195/1/20195/1/2019 9:49:00 AMANR
Chilled loop is under air test, gauge is located in warehouse before it goes outside to the chiller. Phone #: ###-#### Inspection requested via web by Travis Baker
MEC19-01714 Final5/1/20195/1/20195/1/2019 9:36:47 AMPPASS
Our mechanical final passed pending electrical permit. The electrical permit has been pulled. Please pass and close mechanical. Phone #: ###-#### Inspection requested via web by Arielle Hendricks
- final ok
MEC19-01791 Final4/30/20195/1/20195/1/2019 9:34:58 AMANR
Please inspect late AM and call Aleks on your way - ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks
- Called Aleks and they are not ready for inspection.
- Need to add range venting to permit and pay fees by next scheduled inspection
MEC19-01718 Final4/30/20195/1/20195/1/2019 9:30:45 AMAPASS
Please inspect after 10 AM. Phone #: ###-#### Inspection requested via web by Mary LaFayette
- A/C coil co ok
MEC19-01669 Final4/30/20195/1/20195/1/2019 9:09:57 AMAPASS
Our mechanical final passed pending electrical permit. Electrical permit has been pulled. Please pass and close our mechanical permit. Phone #: ###-#### Inspection requested via web by Arielle Hendricks
- final ok
MEC19-01097 Final4/25/20195/1/20195/1/2019 8:41:44 AMAPASS
please be there right at 8 am as customer has to be to work by 930 am we will be there at the same. Phone #: ###-#### Inspection requested via web by Marisa Hone
- final ok
MEC19-01097 Pressure Test4/25/20195/1/20195/1/2019 8:41:23 AMAPASS
please be there right at 8 am as customer has to be to work by 930 am we will be there at the same. Phone #: ###-#### Inspection requested via web by Marisa Hone
- 5lb flue pressure test ok
MEC18-04433 Mec-Aging Inspection5/1/20195/1/20195/1/2019 8:29:06 AM DONE
Called and left Steve with Diamond a voicemail about their mechanical aging permit. Schedule an inspection with the homeowner. Permit will expire at the next mechanical aging inspection.
MEC19-01624 Final4/30/20195/1/20195/1/2019 8:15:08 AMAPASS
Phone #: ###-#### Inspection requested via web by Tim Petsche
- final ok