ELE19-04181
| Electrical Rough-In | 5/1/2020 | 5/1/2020 | 5/1/2020 1:48:59 PM | P | PASS |
|
|
reinspect ceiling on 1st floor. Call me when you arrive to let you in. Thanks, Ron Phone #: ###-#### Inspection requested via web by Ron Zimmerman...1st floor grid complete...ok to cover
|
ELE20-01385
| Rough-In Permanent Service | 4/27/2020 | 5/1/2020 | 5/1/2020 12:56:00 PM | P | PASS |
|
|
Service change Phone #: ###-#### Inspection requested via web by Greg Ballenger.. temped in do to storm and Idaho Power unable to move service lateral...be moved and reconnected first thing 5/4/20 AM p/s u/g reconnect ok
|
ELE20-00930
| Electrical Rough-In | 4/30/2020 | 5/1/2020 | 5/1/2020 12:23:40 PM | P | PASS |
|
|
Electrical Pre-Wire Rough-In. Separate Building and Electrical Permit will be pulled for Solar Array. Please Call Jed at 801.875.3714 with any questions. Phone #: ###-#### Inspection requested via web by Bryan Lawley...ok to cover
|
ELE20-00931
| Electrical Rough-In | 4/30/2020 | 5/1/2020 | 5/1/2020 12:23:17 PM | P | PASS |
|
|
Electrical Pre-Wire Rough-In. Separate Building and Electrical Permit will be pulled for Solar Array. Please Call Jed at 801.875.3714 with any questions. Phone #: ###-#### Inspection requested via web by Bryan Lawley...ok to cover
|
ELE20-00932
| Electrical Rough-In | 4/30/2020 | 5/1/2020 | 5/1/2020 12:22:55 PM | P | PASS |
|
|
Electrical Pre-Wire Rough-In. Separate Building and Electrical Permit will be pulled for Solar Array. Please Call Jed at 801.875.3714 with any questions. Phone #: ###-#### Inspection requested via web by Bryan Lawley...ok to cover
|
ELE20-00933
| Electrical Rough-In | 4/30/2020 | 5/1/2020 | 5/1/2020 12:22:55 PM | P | PASS |
|
|
Electrical Pre-Wire Rough-In. Separate Building and Electrical Permit will be pulled for Solar Array. Please Call Jed at 801.875.3714 with any questions. Phone #: ###-#### Inspection requested via web by Bryan Lawley...ok to cover
|
ELE20-00934
| Electrical Rough-In | 4/30/2020 | 5/1/2020 | 5/1/2020 12:21:03 PM | P | PASS |
|
|
Electrical Pre-Wire Rough-In. Separate Building and Electrical Permit will be pulled for Solar Array. Please Call Jed at 801.875.3714 with any questions. Phone #: ###-#### Inspection requested via web by Bryan Lawley...ok to cover
|
ELE20-00935
| Electrical Rough-In | 4/30/2020 | 5/1/2020 | 5/1/2020 12:21:03 PM | P | PASS |
|
|
Electrical Pre-Wire Rough-In. Separate Building and Electrical Permit will be pulled for Solar Array. Please Call Jed at 801.875.3714 with any questions. Phone #: ###-#### Inspection requested via web by Bryan Lawley...ok to cover
|
ELE20-00936
| Electrical Rough-In | 4/30/2020 | 5/1/2020 | 5/1/2020 12:19:02 PM | P | PASS |
|
|
Electrical Pre-Wire Rough-In. Separate Building and Electrical Permit will be pulled for Solar Array. Please Call Jed at 801.875.3714 with any questions. Phone #: ###-#### Inspection requested via web by Bryan Lawley...ok to cover
|
ELE20-00937
| Electrical Rough-In | 4/30/2020 | 5/1/2020 | 5/1/2020 12:19:00 PM | P | PASS |
|
|
Electrical Pre-Wire Rough-In. Separate Building and Electrical Permit will be pulled for Solar Array. Please Call Jed at 801.875.3714 with any questions. Phone #: ###-#### Inspection requested via web by Bryan Lawley...ok to cover
|
ELE20-01504
| Permanent Service | 5/1/2020 | 5/1/2020 | 5/1/2020 11:52:34 AM | P | CANC |
|
|
Contact: Matt Cinko Phone #: ###-#### Inspection requested via web by Deb Gooden... contractor "Matt" called and stated will not be ready for inspection today
|
ELE20-01506
| Electrical Rough-In | 5/1/2020 | 5/1/2020 | 5/1/2020 10:34:30 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kyle Dillon...new enlarged bathrooms to meet ADA and outlets in shop area on new wall of bathroom
|
ELE20-01494
| Conference | 4/30/2020 | 5/1/2020 | 5/1/2020 10:10:15 AM | A | PASS |
|
|
Adam **call for phone convo** Phone #: ###-####...discussed wiring of new sub panel in garage for machines...discussed wether needed complete service change or use existing meterbase with distribution...max distribution needs verified by manufacturers label...confrerence by phone call
|
ELE20-01482
| Electrical Rough-In | 4/29/2020 | 5/1/2020 | 5/1/2020 9:16:51 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kyle Dillon...enlarged bathroom to meet ADA...ok to cover
|
ELE20-01307
| Final | 4/30/2020 | 5/1/2020 | 5/1/2020 8:56:33 AM | A | PASS |
|
|
Side gate unlocked no dogs room is Unoccupied Phone #: ###-#### Inspection requested via web by Jesse Fuentes...ok to final
|
ELE19-03858
| Electrical Rough-In | 4/30/2020 | 5/1/2020 | 5/1/2020 8:28:08 AM | A | PASS |
|
|
re-inspection for rough in at all window locations for power blinds. All white cords have been removed and replaced with NMB and installed wiremold boxes for connection to white cords. Phone #: ###-#### Inspection requested via web by Todd Hall... rough in ok to cover
|
MIS20-00129
| ELE-Conference | 4/24/2020 | 5/1/2020 | 4/30/2020 3:01:05 PM | A | PASS |
|
|
check for permit...give 30 day if none... business representative made contact and working on hiring contractor...future inspection scheduled 5/29/20
|
ELE20-01499
| Permanent Service | 4/30/2020 | 5/1/2020 | 4/30/2020 2:49:54 PM | A | PASS |
|
|
screened - Aaron Phone #: ###-####... p/s o/h reconnect ok
|