BLD00-00471
| FIRE-Conference | 5/9/2000 | 5/10/2000 | 5/10/2000 12:00:00 AM | P | PASS |
|
|
###-#### Dan final ok for cert. of completion. 5/11/00 11:47:00 AM
|
BLD00-00393
| FIRE-Final Inspection | 5/9/2000 | 5/10/2000 | 5/10/2000 12:00:00 AM | P | PASS |
|
|
###-#### Reinsp. ok for perm. occ. 5/17/00 1:41:23 PM
|
FIR00-00261
| INSP-Final Inspection | 5/9/2000 | 5/10/2000 | 5/10/2000 12:00:00 AM | P | PART |
|
|
brad---###-#### Ok sprinkler R/I need info on fabric cover for fire retardant rating. 5/11/00 11:45:49 AM
|
BLD98-02894
| FIRE-Conference | 5/9/2000 | 5/10/2000 | 5/10/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 05/09/2000 at 15:18:51. Contact: ###-####. Conf. with contractor on service corridor & lobby area. 5/11/00 11:47:19 AM
|
BLD00-00352
| FIRE-Final Inspection | 5/10/2000 | 5/10/2000 | 5/10/2000 12:00:00 AM | P | FAIL |
|
|
jim ###-#### Final fail fire ext. front door sign. 5/11/00 11:46:09 AM
|