BLD00-03542
| BLD-Final | 5/8/2001 | 5/10/2001 | 5/10/2001 12:00:00 AM | A | PART |
|
|
###-#### greg final ok pending fire sign off. 5/10/2001 1:51:45 PM
|
BLD01-00888
| BLD-Framing/Rough-in | 5/10/2001 | 5/10/2001 | 5/10/2001 12:00:00 AM | P | PART |
|
|
after 3:00 Tommy ###-#### head height on stairs /straps 2 losations/ truss web bracing 2 loc. 5/10/2001 4:52:22 PM
|
BLD01-01232
| BLD-Footing | 5/10/2001 | 5/10/2001 | 5/10/2001 12:00:00 AM | P | PASS |
|
|
ft insp-- mark-- ###-####--call 1st before insp
|
BLD01-00910
| BLD-Framing/Rough-in | 5/10/2001 | 5/10/2001 | 5/10/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 05/10/2001 at 10:52:58. Contact: ###-####. exterior walls ok for cover. 5/10/2001 2:11:18 PM
|
MEC01-01380
| Rough-in | 5/10/2001 | 5/10/2001 | 5/10/2001 12:00:00 AM | P | FAIL |
|
|
r/i--todd-- ###-#### seal return air/ insulate conectors above ceilling insulation 5/10/2001 2:31:22 PM
|