PLM01-01459
| Groundwork | 5/9/2001 | 5/10/2001 | 5/10/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 05/09/2001 at 11:43:20. Contact: ###-####. bad leak at wye, other sections ok to cover 5/10/2001 9:12:12 AM
|
PLM01-01466
| Water and/or Sewer | 5/9/2001 | 5/10/2001 | 5/10/2001 12:00:00 AM | A | PASS |
|
|
ron ###-####
|
PLM01-01459
| Groundwork | 5/10/2001 | 5/10/2001 | 5/10/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 330 On 5/10/2001 9:37:34 AM gw ok
|
PLM01-01336
| Plumbing Rough-in | 5/10/2001 | 5/10/2001 | 5/10/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 05/10/2001 at 09:33:24. Contact: ###-####. riok the sump in the basement must be operable and the t&p piped to it for final 5/11/2001 12:04:06 PM
|
PLM01-01354
| Plumbing Rough-in | 5/10/2001 | 5/10/2001 | 5/10/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 05/10/2001 at 09:34:37. Contact: ###-####. ri ok with waters for lavs on exterior walls moved to face of the studs 5/10/2001 1:40:57 PM
|
PLM01-00342
| Plumbing Rough-in | 5/10/2001 | 5/10/2001 | 5/10/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 05/10/2001 at 07:44:02. Contact: ###-####. last condensate 5/10/2001 3:49:50 PM
|