Inspections for the day of: Thursday, May 10, 2001.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-03195 BLD-Conference5/10/20015/10/20015/10/2001 12:00:00 AMAPASS
Added by Inspector: 340 On 5/10/2001 9:59:18 AM w/ Truax; need fresh air; insul. fl...chk at final
BLD00-03195 BLD-Energy code compliance5/10/20015/10/20015/10/2001 12:00:00 AMAPART
Added by Inspector: 340 On 5/10/2001 10:12:06 AM need insul at floor & fresh air intake...ok to cover, chk. at final
BLD01-01079 BLD-Footing5/9/20015/10/20015/10/2001 12:00:00 AMAPART
Ryan ###-#### ..p.l over fence on north...close but ok 5/10/2001 8:41:56 AM
BLD00-01649 BLD-Framing/Rough-in5/9/20015/10/20015/10/2001 12:00:00 AMAFAIL
###-####; c/n, need clarification of rating for wall at bsmt corridor, install 2hr dampers per listing & complete wall assy's per listing & plans.Install shaft framing for hvac exhaust at 3rd fl & up , complete closure for 2hr exit pass. at 1st fl east side5/11/2001 4:13:06 PM 5/11/2001 4:15:01 PM
BLD00-03288 BLD-Final5/10/20015/10/20015/10/2001 12:00:00 AMPFAIL
###-####; c/n dampers 5/10/2001 3:38:59 PM
BLD01-00488 BLD-Framing/Rough-in5/10/20015/10/20015/10/2001 12:00:00 AMPPART
ceiling grid cover insp Tim ###-####
BLD01-00481 BLD-Framing/Rough-in5/10/20015/10/20015/10/2001 12:00:00 AMPPART
###-#### ceiling grid
BLD00-03538 BLD-Concrete5/10/20015/10/20015/10/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 05/10/2001 at 10:58:09. Contact: .pend mti reports 5/11/2001 10:21:56 AM
MEC01-01347 Rough-in5/10/20015/10/20015/10/2001 12:00:00 AMPPART
Todd ###-#### duplex ready for both sides; F.A INSTALLED 5/10/2001 4:04:26 PM
BLD00-03538 BLD-Concrete5/10/20015/10/20015/10/2001 12:00:00 AMPPART
Added by Inspector: 340 On 5/10/2001 4:17:31 PM COL'S, PEND SPEC INSP REPORT