ELE01-00923
| Final | 5/9/2001 | 5/10/2001 | 5/10/2001 12:00:00 AM | A | FAIL |
|
|
dave ###-#### nec 370-20 in ceiling & walls cabinet on ext wall called no ans. 5/10/2001 10:44:43 AM
|
ELE01-01098
| Final | 5/9/2001 | 5/10/2001 | 5/10/2001 12:00:00 AM | A | PASS |
|
|
###-#### entry code 10956 ok final 5/10/2001 11:10:31 AM
|
ELE01-01402
| Final | 5/9/2001 | 5/10/2001 | 5/10/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 05/09/2001 at 13:25:37. Contact: ###-####. t/s u/g n ok 5/10/2001 11:21:37 AM
|
ELE00-03573
| Final | 5/9/2001 | 5/10/2001 | 5/10/2001 12:00:00 AM | P | FAIL |
|
|
dave ###-#### conf with contractor 5/10/2001 4:29:58 PM
|
ELE00-04385
| Electrical Rough-In | 5/9/2001 | 5/10/2001 | 5/10/2001 12:00:00 AM | P | PART |
|
|
Neil ###-#### ok cover walls 2nd floor are 1 core 5/10/2001 12:05:57 PM
|
ELE01-00146
| Electrical Rough-In | 5/10/2001 | 5/10/2001 | 5/10/2001 12:00:00 AM | P | PASS |
|
|
mic #36 Dan ###-#### conf regarding ceiling there is to be NO ceiling tile installed without ok to cover 5/10/2001 3:11:56 PM
|
ELE00-04400
| Final | 5/10/2001 | 5/10/2001 | 5/10/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 05/10/2001 at 09:13:43. Contact: ###-####. ok final rooms third floor only & ok cover ceiling front entry outside 5/10/2001 1:24:23 PM
|
ELE01-01520
| Temporary Service | 5/10/2001 | 5/10/2001 | 5/10/2001 12:00:00 AM | P | PASS |
|
|
bernice ###-#### t/s u/g n ok 5/10/2001 12:33:13 PM
|