MEC02-01264
| Final | 5/9/2002 | 5/10/2002 | 5/10/2002 12:00:00 AM | A | FAIL |
|
|
still in r/i, no gas to f/ps 5/10/2002 9:54:06 AM
|
MEC02-01259
| Rough-in | 5/9/2002 | 5/10/2002 | 5/10/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 05/09/2002 at 11:42:57. Contact: ###-####.
|
MEC02-01265
| Rough-in | 5/9/2002 | 5/10/2002 | 5/10/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 05/09/2002 at 13:02:20. Contact: ###-####.
|
MEC02-01265
| Pressure Test | 5/9/2002 | 5/10/2002 | 5/10/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 05/09/2002 at 13:02:44. Contact: ###-####.
|
MEC02-01212
| Rough-in | 5/9/2002 | 5/10/2002 | 5/10/2002 12:00:00 AM | A | PART |
|
|
meet with three foremans for hobson, looked at smoke/fire dampers as installed, all appeared ok, except one on third flr. south-east corner, motor cut into wall. not all installed 5/10/2002 12:28:49 PM
|
MEC02-01258
| Pressure Test | 5/10/2002 | 5/10/2002 | 5/10/2002 12:00:00 AM | P | PART |
|
|
looked at gas piping and condensate drains, need permit on hydronics 5/10/2002 2:54:39 PM
|
MEC02-00160
| Final | 5/10/2002 | 5/10/2002 | 5/10/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 05/10/2002 at 08:19:28. Contact: ###-####.
|
MEC01-02042
| Final | 5/10/2002 | 5/10/2002 | 5/10/2002 12:00:00 AM | P | FAIL |
|
|
c/n posted, talked to bldg. contractor 5/10/2002 1:46:14 PM
|
MEC02-01271
| Pressure Test | 5/10/2002 | 5/10/2002 | 5/10/2002 12:00:00 AM | P | FAIL |
|
|
changed from plans, need as built drawings, approved by engineer 5/10/2002 3:19:15 PM
|
MEC02-01247
| Rough-in | 5/10/2002 | 5/10/2002 | 5/10/2002 12:00:00 AM | P | FAIL |
|
|
ran out of c/n, called hvac owner, remove screen and grill at comb. air, 1" at b-vent, lap flue piping with direction of air flow 5/10/2002 3:52:31 PM
|