BLD01-00617
| FIRE-Final Inspection | 5/10/2002 | 5/10/2002 | 5/10/2002 12:00:00 AM | P | PASS |
|
|
fire life/safety finaled 5/13/2002 8:01:47 AM
|
BLD01-00308
| FIRE-Final Inspection | 5/10/2002 | 5/10/2002 | 5/10/2002 12:00:00 AM | P | PASS |
|
|
fire life/safety ok. structural inspector to verify the rest of the door hardware was changed out 5/10/2002 3:52:12 PM
|
FIR02-00090
| INSP-Final Inspection | 5/10/2002 | 5/10/2002 | 5/10/2002 12:00:00 AM | P | PASS |
|
|
fire sprinkler system finaled 5/10/2002 3:12:13 PM
|