MIS04-00319
| FIR-Final | 5/10/2005 | 5/10/2005 | 5/10/2005 3:29:09 PM | P | FAIL |
|
|
Fire extinguisher has not yet been moved to a normal path of travel as noted by previous inspection on 3/9/05. Notified tenant of requirements for this issue to be resolved.
|
BLD04-02505
| FIRE-Sprinkler Rough-in | 5/9/2005 | 5/10/2005 | 5/10/2005 1:56:21 PM | A | CANC |
|
|
sunny; Phone #: ###-#### Cancel inspection, called in under the wrong permit type.
|
BLD03-02056
| FIRE-Final Inspection | 5/9/2005 | 5/10/2005 | 5/10/2005 9:57:20 AM | A | PASS |
|
|
Fire life safety finaled.
|
BLD03-02056
| FIRE-Alarm Testing | 5/9/2005 | 5/10/2005 | 5/10/2005 9:55:37 AM | A | PASS |
|
|
Fire alarm passed inspection.
|
FIR04-00237
| INSP-Final Inspection | 5/9/2005 | 5/10/2005 | 5/10/2005 9:48:05 AM | A | PASS |
|
|
Fire sprinkler finaled.
|
FIR04-00593
| INSP-Sprinkler Rough-in/Hydro | 5/9/2005 | 5/10/2005 | 5/10/2005 9:07:59 AM | A | PART |
|
|
Begin 24 hour air test of preaction system at 9:00 am on 5/10/05.
|
FIR04-00387
| INSP-Final Inspection | 5/10/2005 | 5/10/2005 | 5/10/2005 12:00:00 AM | A | PASS |
|
|
Fire alarm finaled.
|
FIR05-00062
| INSP-Sprinkler Rough-in/Hydro | 5/10/2005 | 5/10/2005 | 5/10/2005 12:00:00 AM | P | FAIL |
|
|
Hanger on 1" arm over at end of 2" main, north side, is not within 2' of the end. Pendent head in soffit hard lid at corner is not installed as shown on plan. EQ brace on relocated 2 1/2" main is not installed on the last piece of main as shown on plan.
|