Inspections for the day of: Thursday, May 10, 2007.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD06-03431 FIRE-Conference5/10/20075/10/20075/11/2007 3:52:34 PMPDONE
I went over the life safety requirements with the contractor.
FIR06-00664 INSP-Sprinkler Rough-in5/8/20075/10/20075/11/2007 1:31:30 PMPPART
Today 5/10 I spent time on the Anthem project FIR06-00664, 1st - 4th floor.
The first floor standpipe connection was incomplete, otherwise the 1st floor was good.
The second floor was good with exception to a couple of under-spaced heads.
The third floor was done with exception to the aux drain a two missing heads that were shown but not installed.
The fourth floor was a little over done with 60 + extra 1.25" 90's added to the grid. I called for a re-sub for the calcs and drawings.
I also took a look at the 2nd floor TI upon request. FIR07-00103. It was in great shape.
FIR07-00130 INSP-Sprinkler Rough-in5/10/20075/10/20075/10/2007 3:54:45 PMPFAIL
I started the inspection on the first floor and found the first piece of pipe I looked at was the wrong size. We went to the attic system and found that what was marked on the newest drawings as as-built was not actually installed that why. This includes heads in the remote area and in the dormers. Basically no inspection was done. I spoke to Mike Beerman and he said he would get things taken care of and the inspection called back in.
FIR06-00719 INSP-Final Inspection5/9/20075/10/20075/10/2007 3:09:44 PMPFAIL
The central station did not receive all of the signals.
FIR06-00718 INSP-Final Inspection5/9/20075/10/20075/10/2007 3:08:45 PMPPASS
permit finaled
FIR06-00720 INSP-Final Inspection5/9/20075/10/20075/10/2007 3:07:01 PMPPASS
permit finaled
FIR06-00744 INSP-Final Inspection5/10/20075/10/20075/10/2007 2:05:38 PMPFAIL
Need permanant heat installed in building for the fire sprinkler system. All other items are ok. Forward flush passed.
FIR06-00745 INSP-Final Inspection5/10/20075/10/20075/10/2007 2:04:37 PMPFAIL
Need permanant heat installed in building for the fire sprinkler system. All other items are ok. Forward flush passed.
FIR06-00617 INSP-Final Inspection5/10/20075/10/20075/10/2007 2:03:24 PMPFAIL
Need permanant heat installed in building for the fire sprinkler system. All other items are ok. Forward flush passed.
FIR07-00130 INSP-Sprinkler Rough-in5/9/20075/10/20075/10/2007 12:03:00 PMACANC
Contractor could not meet me when I needed to be at the project. To be rescheduled.
FIR07-00376 INSP-Sprinkler Rough-in5/9/20075/10/20075/10/2007 11:27:58 AMAPASS
Sprinkler piping is ok to cover.
FIR05-00536 INSP-Sprinkler Rough-in5/9/20075/10/20075/10/2007 10:05:38 AMAPASS
Mission Corridor sprinkler piping is ok to cover.
FIR07-00073 FIR-Aging Inspection5/10/20075/10/20075/10/2007 9:19:14 AM NR
The building is still being built. Work is in progress
FIR07-00206 INSP-Final Inspection5/9/20075/10/20075/10/2007 9:13:44 AMAPASS
Permit finaled.