Inspections for the day of: Thursday, May 10, 2007.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD06-00749 BLD-Footing5/10/20075/10/20075/10/2007 4:34:33 PMPPASS
tom; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. Interior grade beam footings.
BLD06-00749 BLD-Framing/Rough-in5/10/20075/10/20075/10/2007 3:42:01 PMPPASS
tom; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. Interior framing. Pending elec.
BLD07-00758 BLD-Framing/Rough-in5/10/20075/10/20075/10/2007 2:31:27 PMPPASS
robbins const. ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD07-00437 BLD-Framing/Rough-in5/9/20075/10/20075/10/2007 2:16:44 PMPPASS
lance; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
BLD06-02105 BLD-Other5/10/20075/10/20075/10/2007 1:28:01 PMPPASS
Scheduled by a contractor via Hello! on 5/10/2007 at 8:39:27 AM. Stair enclosure ok.
BLD07-00535 BLD-Footing5/9/20075/10/20075/10/2007 1:11:28 PMPPASS
darin - pour at 1 PM; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. Footing for dockwalls.
BLD06-01621 BLD-Conference5/9/20075/10/20075/10/2007 11:44:05 AMAPASS
Inspect the south stair well for cover. Ceilings in the bathrooms need inspections for cover. Phone #: ###-#### Internet Inspection Request from: Duane Seid. Ok to cover south wall of south stairtower. Also inspected smoke stop application between slab edge and curtain wall at 2nd floor north end. Contractor to schedule framing inspection for TI on 2nd floor.
BLD07-00595 BLD-Energy code compliance5/9/20075/10/20075/10/2007 10:31:44 AMAPASS
gary - insulation ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD06-01784 BLD-Framing/Rough-in5/9/20075/10/20075/10/2007 10:14:01 AMAPASS
pat; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. ok to insul soffits.
BLD06-01785 BLD-Framing/Rough-in5/9/20075/10/20075/10/2007 10:12:47 AMAPART
pat; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. ok to rock hard lids in restrooms.
BLD07-01128 BLD-Footing5/9/20075/10/20075/10/2007 9:28:54 AMAPART
nat; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. Perimeter footing at exsting porch area.
BLD07-00175 BLD-Energy code compliance5/9/20075/10/20075/10/2007 9:10:40 AMAFAIL
kevin Note: please call 1/2 hr prior to inspection; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Needs mech ri insp. No truss engineering on site. Willl call back for framing insp. tomorrow.