FIR13-00100
| INSP-Final Inspection | 5/8/2013 | 5/10/2013 | 5/10/2013 3:51:51 PM | P | PASS |
|
|
Permit finaled
|
BLD12-00382
| FIRE-Final Inspection | 5/9/2013 | 5/10/2013 | 5/10/2013 3:36:55 PM | P | PART |
|
|
The "accounting" area and the temporary exit corridor has passed life safety.
|
FIR13-00070
| INSP-Sprinkler Rough-in/Hydro | 5/9/2013 | 5/10/2013 | 5/10/2013 3:30:30 PM | P | PASS |
|
|
Wet system hydro test passed
|
FIR13-00074
| INSP-Sprinkler Rough-in | 5/9/2013 | 5/10/2013 | 5/10/2013 3:06:54 PM | P | PASS |
|
|
This is a rough to cover for the 1st floor. See the city approved plans for locations where piping can be covered.
|
FIR13-00164
| INSP-Sprinkler Rough-in | 5/10/2013 | 5/10/2013 | 5/10/2013 2:27:43 PM | P | PASS |
|
|
See the city approved plans for locations where piping can be covered.
|
FIR13-00163
| INSP-Sprinkler Rough-in | 5/10/2013 | 5/10/2013 | 5/10/2013 12:35:45 PM | P | PASS |
|
|
See the city approved plans for locations where piping can be covered.
|
FIR13-00177
| INSP-Sprinkler Rough-in | 5/10/2013 | 5/10/2013 | 5/10/2013 11:19:18 AM | P | PASS |
|
|
Sprinkler piping is ok to cover.
|
BLD13-01108
| FIRE-Final Inspection | 5/10/2013 | 5/10/2013 | 5/10/2013 11:15:19 AM | P | PASS |
|
|
Life safety passed. The fire extinguisher is on the way and being provided by Don at Fire extreme.
|
FIR12-00583
| INSP-Supply line flush | 5/9/2013 | 5/10/2013 | 5/10/2013 9:52:52 AM | A | PASS |
|
|
The underground flush for the four north most units passed.
|