PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Friday, May 10, 2013
.
Number of inspections:
23
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Clint A Smith
Title
EROSION CONTROL INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC13-00290
General Inspection
5/10/2013
5/10/2013
5/14/2013 3:15:28 PM
PASS
ESC13-00419
Site Preparation
5/10/2013
5/10/2013
5/10/2013 3:11:40 PM
CANC
Moved to 5/13/2013
ESC10-00495
General Inspection
5/10/2013
5/10/2013
5/10/2013 3:10:41 PM
FAIL
Need to stabilie all disturbed area of the porject that is or will be inactive for my than 14 days. Will follow up next weeek
ESC13-00274
Site Preparation
5/10/2013
5/10/2013
5/10/2013 3:08:44 PM
FAIL
Verbal to RP:
Post ESC sign. Clean up all sediment residual off of the hard surfaces.
ESC13-00239
Site Preparation
5/10/2013
5/10/2013
5/10/2013 3:08:35 PM
FAIL
Verbal to RP:
Post ESC sign. Clean up all sediment residual off of the hard surfaces.
ESC13-00231
Site Preparation
5/10/2013
5/10/2013
5/10/2013 3:08:23 PM
FAIL
Verbal to RP:
Post ESC sign. Clean up all sediment residual off of the hard surfaces.
ESC13-00241
Site Preparation
5/10/2013
5/10/2013
5/10/2013 3:08:12 PM
FAIL
Verbal to RP:
Post ESC sign. Clean up all sediment residual off of the hard surfaces.
ESC13-00247
Site Preparation
5/10/2013
5/10/2013
5/10/2013 3:08:02 PM
FAIL
Verbal to RP:
Post ESC sign. Clean up all sediment residual off of the hard surfaces.
ESC13-00240
Site Preparation
5/10/2013
5/10/2013
5/10/2013 3:07:53 PM
FAIL
Verbal to RP:
Post ESC sign. Clean up all sediment residual off of the hard surfaces.
ESC13-00244
Site Preparation
5/10/2013
5/10/2013
5/10/2013 3:07:43 PM
FAIL
Verbal to RP:
Post ESC sign. Clean up all sediment residual off of the hard surfaces.
ESC13-00246
Site Preparation
5/10/2013
5/10/2013
5/10/2013 3:07:30 PM
FAIL
Verbal to RP:
Post ESC sign. Clean up all sediment residual off of the hard surfaces.
ESC12-00627
BMP Violation
5/8/2013
5/10/2013
5/10/2013 3:00:01 PM
A
FAIL
C/N notice(message to RP)
Clean up all sedimentand debris off of the hard surfaces. Conntainerize or remove all trash debris not located in the waste bins. Failue to comply with the given notice will result in further enforcement. Will re-inspect on 5/13/2013
ESC09-00352
General Inspection
5/10/2013
5/10/2013
5/10/2013 2:55:28 PM
PASS
ESC12-00768
General Inspection
5/10/2013
5/10/2013
5/10/2013 2:38:38 PM
PASS
ESC12-01041
Aging Inspection
5/10/2013
5/10/2013
5/10/2013 2:37:45 PM
PASS
ESC13-00344
General Inspection
5/10/2013
5/10/2013
5/10/2013 2:28:11 PM
PASS
ESC12-00888
BMP Violation
5/7/2013
5/10/2013
5/10/2013 2:27:34 PM
A
PASS
ESC13-00299
BMP Violation
5/7/2013
5/10/2013
5/10/2013 2:27:23 PM
A
PASS
ESC13-00232
Site Preparation
5/10/2013
5/10/2013
5/10/2013 11:03:29 AM
PASS
ESC12-00938
Aging Inspection
5/10/2013
5/10/2013
5/10/2013 10:45:18 AM
DONE
Permit finaled
ESC12-00938
DOC - Permit Finaled
5/10/2013
5/10/2013
5/10/2013 10:44:54 AM
P
PASS
ESC10-00778
General Inspection
5/10/2013
5/10/2013
5/10/2013 10:44:31 AM
PASS
ESC13-00291
Site Preparation
5/10/2013
5/10/2013
5/10/2013 10:43:11 AM
DONE
Work will not begin until the 21st of May due to the 14 waiting period with the NOI filing. Will re-inspect on 5/21/2013