FIR16-00738
| INSP-Conference | 5/10/2017 | 5/10/2017 | 5/10/2017 2:02:39 PM | P | PASS |
|
|
See the city approved plans for areas marked OK where tenting has passed inspection and the piping can be covered. Herb and I also discussed making the fake beams out of non-combustible material so that sprinkler protection will not be required inside.
|
FIR17-00002
| INSP-Sprinkler Rough-in/Hydro | 5/9/2017 | 5/10/2017 | 5/10/2017 1:44:45 PM | P | PASS |
|
|
Overhead hydro test passed
|
FIR17-00116
| INSP-Final Inspection | 5/9/2017 | 5/10/2017 | 5/10/2017 12:38:01 PM | A | PASS |
|
|
permit finaled
|