Inspections for the day of: Thursday, May 10, 2018.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRock A. Hudson
TitleELE-INSPECTOR
Phone #794-6794
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE18-01751 Conference5/10/20185/10/20185/10/2018 3:26:33 PMPDONE
Phone #: ###-#### Inspection requested via web by Brad Rowen
Brad is married to Hilda Fernandes daughter and resides at residence.
Discussed 2 basement bathroom remodel. 20 amp dedicated circuit to receptacles, location, tamper resistant, NM secure and support, ampacity for 20 amp, bath fan located in shower owner to check instruction to check if allowed. possible path to get circuit to bathroom receptacles. Open wiring behind mechanical door to be installed in a box. Most frequently asked question hand out given.
ELE18-01049 Final5/10/20185/10/20185/10/2018 2:10:45 PMPPART
Except cubicles Phone #: ###-#### Inspection requested via web by Ron Zimmerman
Corrections not complete. EMT above trusses existing from original install and no wiring added. OK to remain.
300.4(E)- MC cables shall not run over trusses in shallow grooves. Only exception is for IMC and RMC can be installed with in 1 1/2" of lowest part of roof decking.
Contractor will either move MC cables or protect with IMC or heavier shield.
All located above trusses. Will check on final.
Signed card TCO
ELE18-01748 Rough-In Permanent Service5/9/20185/10/20185/10/2018 12:44:52 PMPPASS
Phone #: ###-#### Inspection requested via web by Eric Schroeder
No service work done... upstairs remodel rough in ok cover.
ELE18-00130 Electrical Rough-In5/10/20185/10/20185/10/2018 11:16:06 AMPPASS
We need an inspection on the upper level bathroom electric floor heat! Phone #: ###-#### Inspection requested via web by Steven Meredith
Completed both at am inspection
ELE18-01359 Electrical Rough-In5/9/20185/10/20185/10/2018 11:11:08 AMAPASS
Job Foreman : Jay Karel Phone #: ###-#### Inspection requested via web by Laurie Hoelscher
Listing confirmed rough in ok
ELE18-00130 Electrical Rough-In5/10/20185/10/20185/10/2018 10:51:56 AMAPASS
We need an inspection on the basement bathroom electric floor heat! Phone #: ###-#### Inspection requested via web by Steven Meredith
BAsement and upstair bath floor heat rough in ok cover.
ELE17-01337 Electrical Rough-In5/9/20185/10/20185/10/2018 10:27:23 AMAPASS
We are requesting an underground light pole inspection on the East side of the project. Our contact is Rick Badley @ ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Clint Tate
South east light pole base and underground rough in ok cover
ELE18-01295 Electrical Rough-In5/9/20185/10/20185/10/2018 9:52:02 AMAPASS
r/i for East side // Jose Phone #: ###-#### East furniture ok to occupy.
ELE18-01291 Rough-In Permanent Service5/9/20185/10/20185/10/2018 9:25:00 AMAPASS
Phone #: ###-#### Inspection requested via web by kevin blackmon
Rough in ok cover p/s u/g n ok