Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC18-00251 General Inspection5/10/20185/10/20185/11/2018 10:59:41 AMPPASS
Did site walk through with Micron storm water team. Looked at location of future nitrogen plant and state of site. SIte is well managed and maintained. Trash is contained, kept in covered dust, water trucks are in use and site is free of dust. Work on new pump system for water.
All construction traffic is required to take controlled construction entrance and exit.
Building 37 is self contained in parking lot.
Micron is doing weekly site inspections and has all records.
ESC18-00006 General Inspection5/10/20185/10/20185/11/2018 10:59:28 AMPPASS
Did site walk through with Micron storm water team. Looked at location of future nitrogen plant and state of site. SIte is well managed and maintained. Trash is contained, kept in covered dust, water trucks are in use and site is free of dust. Work on new pump system for water.
All construction traffic is required to take controlled construction entrance and exit.
Building 37 is self contained in parking lot.
Micron is doing weekly site inspections and has all records.
ESC16-00242 General Inspection5/10/20185/10/20185/11/2018 10:59:13 AMPPASS
Did site walk through with Micron storm water team. Looked at location of future nitrogen plant and state of site. SIte is well managed and maintained. Trash is contained, kept in covered dust, water trucks are in use and site is free of dust. Work on new pump system for water.
All construction traffic is required to take controlled construction entrance and exit.
Building 37 is self contained in parking lot.
Micron is doing weekly site inspections and has all records.
ESC17-00419 Site Final5/9/20185/10/20185/10/2018 2:41:44 PMPPASS
ESC17-01316 General Inspection5/9/20185/10/20185/10/2018 1:33:11 PMAPASS
WIP, Suez water on site. Inlets in work area are protected. No dirt is leaving site and making it to river.
ESC17-01473 General Inspection5/9/20185/10/20185/10/2018 1:02:00 PMAPASS
Signage has been updated as requested. Secondary perimeter controls installed by wattle at pond edge. No ESC issues on site.
ESC17-00816 Aging Inspection5/10/20185/10/20185/10/2018 12:10:30 PM PASS
School. Will return when class out for summer.
ESC17-01200 General Inspection5/10/20185/10/20185/10/2018 11:56:51 AMPPASS
Shells of two tilt ups complete and working on cores. WIP on construction of third tilt up. Site is prepped for curb, paving supposed to be in a month. Water truck on site, very little dust for size of site. Entrance and curbs are being installed off of Eisenman.
ESC17-01043 General Inspection5/10/20185/10/20185/10/2018 11:56:36 AMPPASS
Shells of two tilt ups complete and working on cores. WIP on construction of third tilt up. Site is prepped for curb, paving supposed to be in a month. Water truck on site, very little dust for size of site. Entrance and curbs are being installed off of Eisenman.
ESC17-01488 General Inspection5/10/20185/10/20185/10/2018 11:23:47 AMPPASS
Site grading underway. Entrances are built, water truck on site. Some dust is being kicked up by front end loader near haul road and stockpile area. Weekly site inspections are being done by Specialty Supply.
ESC17-00648 General Inspection5/10/20185/10/20185/10/2018 10:56:44 AM PASS
Some exterior painting and/or stucco work rmains. Landscape crew on site.
ESC17-00591 General Inspection5/10/20185/10/20185/10/2018 10:56:05 AM PASS
Exterior work looks complete. Landscapers on site installing sprinkler system.
ESC17-00970 Aging Inspection5/10/20185/10/20185/10/2018 10:30:35 AM CANC
ESC17-00970 DOC - Permit Finaled5/10/20185/10/20185/10/2018 10:30:29 AMPPASS
ESC16-01232 General Inspection5/10/20185/10/20185/10/2018 10:13:45 AM PASS
Grass on hillside coming in. No issues.