Inspections for the day of: Friday, May 10, 2019.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMark Moncarr
TitleELE-INSPECTOR
Phone #685-9023
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE16-00444 ELE-Aging Inspection5/10/20195/10/20195/17/2019 5:56:55 AM DONE
Can we try to coordinate access to look at signs at Kennsingto Apts.
ELE16-00098 ELE-Aging Inspection5/10/20195/10/20195/14/2019 11:02:42 AM DONE
Called and left message on 5/14 at 1100 in regards to pulling another permit for A/C final.
ELE19-01530 Final5/9/20195/10/20195/10/2019 3:14:54 PMPPASS
Gate and garage door are open. Homeowner "thinks" they will be home. If I need to meet you, please call 30min in advance. Thank you!
Ashley Harker (PM) ###-#### Phone #: ###-#### Inspection requested via web by Rob Maes Ok final. 30a disc, 30a brkr.
ELE19-01493 Electrical Rough-In5/10/20195/10/20195/10/2019 2:11:19 PMPPASS
Ufer Inspection
For both compressor Pads. Please call Joe with any questions. Phone #: ###-#### Inspection requested via web by Tye Thomas Ok cover ufer for compressor pads.
ELE19-01270 Final5/10/20195/10/20195/10/2019 2:10:47 PMPPASS
Job was called in as a RI, was supposed to be a final.
ELE19-00974 Electrical Rough-In5/10/20195/10/20195/10/2019 1:47:45 PMPPASS
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Ok cover bathroom ceilings up and down
ELE19-01565 Electrical Rough-In5/10/20195/10/20195/10/2019 1:22:49 PMPPASS
Underground Inspection
Owners number is listed. Inspection area is behind house. Backyard is open and accessible for inspection. Updating service from overhead to underground. Also adding one branch circuit from panel underground. Any electrical questions please call Joe @###-####. Phone #: ###-#### Inspection requested via web by Tye Thomas Ok cover grd work.
ELE18-01465 Final4/10/20195/10/20195/10/2019 1:22:15 PMAPASS
###-####. Re-scheduled for 5/10/19. Homeowner said pool comp was coming back 5/8/19 to get pool ready for use after it was winterized. Some breakers were off, and I didnt want to turn them on and chance damaging pool equiptment. Ok final.
ELE18-04302 Final5/9/20195/10/20195/10/2019 12:22:10 PMPPASS
###-#### Ok final. Light was moved in mstr closet, and A/C wired.
ELE19-01490 Final5/9/20195/10/20195/10/2019 11:42:50 AMAPASS
Final on Service Change and Sub Panel. Electrician: Kim ###-####
Home Owner: Cheryl ###-####
Friday Morning After 9am if possible for the homeowner. Thank You
Phone #: ###-#### Inspection requested via web by Steve Blackmer Ok final.
ELE19-01409 Final5/9/20195/10/20195/10/2019 11:41:54 AMANR
Please call two hours ahead to Garrett ###-#### if you can Phone #: ###-#### Inspection requested via web by BRS Permitting No access. Called and left message at 920am, havent heard back
ELE19-00905 Electrical Rough-In5/9/20195/10/20195/10/2019 10:37:20 AMAFAIL
Nicole (homeowner)-please go out after 9:30 am-frame insp is PM Phone #: ###-####
1. 1/2" connectors needed in can light and fan.
2. Changed out metal junction box to a larger cubic inch box to allow for box fill.
3. All wires need to be stapled within 8" of box it enters.
ELE19-01270 Electrical Rough-In5/3/20195/10/20195/10/2019 10:11:57 AMAPASS
Plans left on site in meter box Phone #: ###-#### Inspection requested via web by Brecklee Brown Ok final. Line side, 60a fuses. 225a buss rating.
ELE19-00533 Electrical Rough-In5/10/20195/10/20195/10/2019 10:11:16 AMAPASS
Phone #: ###-#### Inspection requested via web by Steven Burch Ok cover. Corrections made.
ELE19-01594 Final5/10/20195/10/20195/10/2019 9:19:23 AMAPASS
Ok final. Existing installation was finaled by Dug Poedy in 2014.
ELE19-01594 Electrical Rough-In5/9/20195/10/20195/10/2019 9:18:46 AMAPASS
listing inspection for solar equipment; I''ll have a couple guys there in the morning for ya; the job is completed so hopefully we can get the inspection early, but fully understand the flow! thanks guys Phone #: ###-#### Inspection requested via web by Ryan King Install was finaled by Doug Poedy in 2014. There were panels added to existing installation, and was re-submitted to plan review for such.
ELE17-04235 Final5/9/20195/10/20195/10/2019 9:14:13 AMAPASS
###-#### Ok final.