ELE19-00595
| Final | 5/10/2019 | 5/10/2019 | 5/10/2019 2:42:00 PM | P | PASS |
|
|
garage code 2018 Phone #: ###-#### Inspection requested via web by Darryn Coburn Final ok
|
ELE19-01484
| Permanent Service | 5/8/2019 | 5/10/2019 | 5/10/2019 1:56:41 PM | P | PASS |
|
|
** RE-ENERGIZE INSP** Pls contact Barry (Electrician) @ ###-#### one hr prior to arrival. Power restored around 2-3pm. Thank you. Inspection requested via web by Rob Maes p/s o/h rec ok
|
ELE19-01705
| Final | 5/10/2019 | 5/10/2019 | 5/10/2019 1:45:15 PM | P | PASS |
|
|
Call for access // Joe Phone #: ###-#### Final ok
|
ELE19-00801
| Final | 5/10/2019 | 5/10/2019 | 5/10/2019 1:30:46 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Sherry Allen Final ok, card signed
|
ELE19-01716
| Electrical Rough-In | 5/9/2019 | 5/10/2019 | 5/10/2019 12:58:43 PM | P | PASS |
|
|
adding a new washer circuit and dryer circuit. I will be onsite. Phone #: ###-#### Inspection requested via web by Justin Yount Rough-in ok for addtition of washer and dryer
|
ELE19-01703
| Permanent Service | 5/10/2019 | 5/10/2019 | 5/10/2019 12:58:11 PM | P | PASS |
|
|
please call 30 min prior Phone #: ###-#### Inspection requested via web by John Edwards p/s o/h n ok
|
ELE19-00206
| Final | 5/10/2019 | 5/10/2019 | 5/10/2019 12:02:28 PM | P | PASS |
|
|
just need to close this one no work has been done other than pulling the meter for siding you look at if want but it will be the same as last inspection Phone #: ###-#### Inspection requested via web by dennis mcneely Closing permit as nothing to look at
|
ELE19-01363
| Final | 5/9/2019 | 5/10/2019 | 5/10/2019 12:01:55 PM | A | PASS |
|
|
Please call two hours ahead to Sandra ###-#### if you can. Phone #: ###-#### Inspection requested via web by BRS Permitting Solar Array final ok
|
ELE15-01664
| Final | 5/9/2019 | 5/10/2019 | 5/10/2019 11:27:10 AM | A | PASS |
|
|
Any Questions please call Louis at ###-#### Phone #: ###-#### Inspection requested via web by Louis Keller Pool final ok
|
ELE19-01556
| Final | 5/9/2019 | 5/10/2019 | 5/10/2019 11:07:43 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by BRS Permitting Final ok
|
ELE19-01323
| Final | 5/9/2019 | 5/10/2019 | 5/10/2019 10:49:26 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Jason Wicks Final ok
|
ELE19-01713
| Conference | 5/9/2019 | 5/10/2019 | 5/10/2019 10:13:01 AM | A | DONE |
|
|
I need to meet inspector at this job site to go over a plan before we start work. Phone #: ###-#### Inspection requested via web by Barbara Szurgot Discussed service change on 480/277V 800 amp service to be change out on memorial day weekend.... Building steel will be grounded and need to verify main grounding source in new service..... Gear will be less depth then what is currently install to maintain work space clearences.... All panels in shop to be switched out and was told no area of classification at this time as no storage of fuel is apparent....
|
ELE19-01327
| Electrical Rough-In | 5/10/2019 | 5/10/2019 | 5/10/2019 9:46:03 AM | A | PASS |
|
|
storefront Phone #: ###-#### Inspection requested via web by Bryan McLaughlin Store front wall and cash wrap wall ok to cover
|