PLM00-01548
| Plumbing Rough-in | 5/10/2000 | 5/11/2000 | 5/11/2000 12:00:00 AM | A | PASS |
|
|
Chris ###-####
|
PLM00-01471
| Water Heater Final | 5/10/2000 | 5/11/2000 | 5/11/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 05/10/2000 at 20:24:54. Contact: ###-####.
|
PLM99-02531
| Final | 5/11/2000 | 5/11/2000 | 5/11/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 05/11/2000 at 07:50:58. Contact: ###-####.
|
PLM00-00583
| Final | 5/11/2000 | 5/11/2000 | 5/11/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 05/11/2000 at 07:52:02. Contact: ###-####. seal cabinet at floor sink in breakroom, set equipment in breakroom, provide main shutoff valve by dcva 5/11/00 3:00:36 PM
|
PLM00-01552
| Final | 5/11/2000 | 5/11/2000 | 5/11/2000 12:00:00 AM | P | PASS |
|
|
###-####---for access go to -back door off side street
|
PLM00-00583
| Final | 5/11/2000 | 5/11/2000 | 5/11/2000 12:00:00 AM | P | PART |
|
|
billy bob seal cabinet at floor sink, set equipment, needs main shutoff valve 5/11/00 3:01:23 PM
|