PLM01-00426
| Final | 5/10/2001 | 5/11/2001 | 5/11/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 05/10/2001 at 18:09:50. Contact: ###-####.
|
PLM01-01182
| Storm Drains | 5/11/2001 | 5/11/2001 | 5/11/2001 12:00:00 AM | A | PART |
|
|
Added by Inspector: 330 On 5/11/2001 11:42:27 AM still needs test on the rear 10" exterior sd line, the 2 6" drains out the front are per plan but the roof drains leaving the building are 8", The engineer is working on changing the rd to 6", sizing is ok, cover at their own risk.
|
PLM01-01489
| Plumbing Rough-in | 5/11/2001 | 5/11/2001 | 5/11/2001 12:00:00 AM | P | PASS |
|
|
after 1:45 pm ###-####
|
PLM01-01485
| Sprinkler (Final) | 5/11/2001 | 5/11/2001 | 5/11/2001 12:00:00 AM | P | PASS |
|
|
spr fn-- matt-- ###-####
|
PLM01-01486
| Water and/or Sewer | 5/11/2001 | 5/11/2001 | 5/11/2001 12:00:00 AM | P | PASS |
|
|
###-####
|