Inspections for the day of: Friday, May 11, 2001.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-00835 BLD-Conference5/10/20015/11/20015/11/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 05/10/2001 at 11:59:40. Contact: ###-####...ok to use 42" door at ext near stairs...jack intrude a small amount to doorway 5/11/2001 9:36:07 AM
BLD01-00027 BLD-Framing/Rough-in5/10/20015/11/20015/11/2001 12:00:00 AMAPART
ceiling grid joe ###-####, ceiling ok...plan check has resub. according to Mike Hopkins. OK to continue pending verification of deletion of 1hr corridor from conference rm. 5/11/2001 10:17:25 AM
BLD00-03569 BLD-Conference5/11/20015/11/20015/11/2001 12:00:00 AMAPASS
Added by Inspector: 340 On 5/11/2001 8:42:15 AM w/ bldr re insp req's
BLD01-00835 BLD-Framing/Rough-in5/11/20015/11/20015/11/2001 12:00:00 AMAPART
Added by Inspector: 340 On 5/11/2001 9:36:48 AM shear nailing ok
BLD01-00452 BLD-Conference5/11/20015/11/20015/11/2001 12:00:00 AMAPART
Added by Inspector: 340 On 5/11/2001 10:20:00 AM
BLD01-00990 BLD-Final5/11/20015/11/20015/11/2001 12:00:00 AMAFAIL
###-#### late am thanks; nr, need other finals 5/11/2001 4:30:16 PM
BLD99-02049 BLD-Final5/11/20015/11/20015/11/2001 12:00:00 AMPPASS
Final reinspect... 5/11/2001 2:58:07 PM
BLD99-03383 BLD-Framing/Rough-in5/11/20015/11/20015/11/2001 12:00:00 AMPFAIL
Added by Inspector: 340 On 5/11/2001 4:17:01 PM need shafts at hvac exhaust thru floors 3,4; clarify masonry const for 4hr wall at bsmt...cl. B-4 blocks req'd?
BLD00-03538 BLD-Concrete5/10/20015/11/20015/11/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 05/10/2001 at 10:58:51. Contact: .pending insp report 5/11/2001 2:55:22 PM