BLD01-00981
| BLD-Framing/Rough-in | 5/10/2001 | 5/11/2001 | 5/11/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 05/10/2001 at 13:15:42. Contact: ###-####. needs aproval for front wall built back from foundation. 12/11/2001 12:14:35 PM
|
MEC01-00418
| Final | 5/10/2001 | 5/11/2001 | 5/11/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 05/10/2001 at 22:47:38. Contact: ###-####.
|
BLD00-02937
| BLD-Final | 5/10/2001 | 5/11/2001 | 5/11/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 05/10/2001 at 22:49:07. Contact: ###-####. insulate rim joist,temp glass at lower stairs,fire calk garage wall,drainage required away also containment. c/n posted. 12/11/2001 11:33:11 AM
|
BLD00-01084
| BLD-Final | 5/11/2001 | 5/11/2001 | 5/11/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 05/11/2001 at 09:04:13. Contact: ###-####. ok perm oc. 12/11/2001 3:45:22 PM
|
BLD00-02937
| BLD-Final | 5/11/2001 | 5/11/2001 | 5/11/2001 12:00:00 AM | P | CANC |
|
|
###-#### transfer to 301 12/11/2001 4:22:07 PM
|
BLD01-00416
| BLD-Final | 5/10/2001 | 5/11/2001 | 5/11/2001 12:00:00 AM | P | NR |
|
|
###-#### needs fire /life safety before calling for final. 12/11/2001 1:04:11 PM
|
BLD00-02809
| BLD-Framing/Rough-in | 5/10/2001 | 5/11/2001 | 5/11/2001 12:00:00 AM | P | PART |
|
|
Tim ###-#### ok to i nsulate need some adnl caulking done . 12/11/2001 3:44:11 PM
|
BLD00-02820
| BLD-Concrete | 5/10/2001 | 5/11/2001 | 5/11/2001 12:00:00 AM | P | PART |
|
|
Tim ###-####
|