BLD07-01047
| BLD-Foundation | 5/11/2007 | 5/11/2007 | 5/14/2007 2:56:39 PM | P | PART |
|
|
dave ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
BLD06-01759
| BLD-Other | 5/10/2007 | 5/11/2007 | 5/11/2007 3:47:49 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 5/10/2007 at 11:27:03 PM. Contact: ###-####. window well ok
|
MIS07-00109
| BLD-Conference | 5/10/2007 | 5/11/2007 | 5/11/2007 3:33:58 PM | P | PASS |
|
|
james walker --###-####-- for proprietary going to 2603 n 28th need at least $5000 bond
|
BLD06-03596
| BLD-Framing/Rough-in | 5/11/2007 | 5/11/2007 | 5/11/2007 3:00:59 PM | P | PASS |
|
|
mark; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD06-01483
| BLD-Framing/Rough-in | 5/10/2007 | 5/11/2007 | 5/11/2007 12:25:26 PM | A | PASS |
|
|
ben ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith door frame ok
|
BLD07-01090
| BLD-Footing | 5/11/2007 | 5/11/2007 | 5/11/2007 12:17:58 PM | A | PART |
|
|
Late morning inpection. Thanks Phone #: ###-#### Internet Inspection Request from: Gary Beck monolithic pour on addition ok
|
BLD07-00480
| BLD-Framing/Rough-in | 5/9/2007 | 5/11/2007 | 5/11/2007 12:08:18 PM | A | NR |
|
|
larry ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith conf only,, need letter from eng on pier ftgs,, need trades 1st on frame,, ext shear not looked at,, did spot checks,, appears ok
|
BLD07-00975
| BLD-Framing/Rough-in | 5/10/2007 | 5/11/2007 | 5/11/2007 11:49:17 AM | A | NR |
|
|
joe pls call 30 min prior; Phone #: ###-#### Internet Inspection Request from: Victoria Beall conf on phone,, need trades 1st
|
BLD07-00828
| BLD-Footing | 5/10/2007 | 5/11/2007 | 5/11/2007 11:44:36 AM | A | PART |
|
|
walker const- ###-#### will pour at 11:30 wip,,
|
BLD07-00358
| BLD-Framing/Rough-in | 5/10/2007 | 5/11/2007 | 5/11/2007 12:00:00 AM | A | CANC |
|
|
rob; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|