Inspections for the day of: Monday, May 11, 2009.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR07-00971 INSP-Alarm Testing5/8/20095/11/20095/13/2009 5:02:10 PMPFAIL
Need to provide NFPA 72 record of inspection and testing including a signals list prior to final on site acceptance test, missing building map at the FACP for device and zone locations, field installation does not match approved plans including sprinkler risers, deleted/added devices, etc., plan resubmittals are necessary to reflect changes, noted some minor field adjustments to be made for spacing of notification devices.
FIR09-00156 INSP-Final Inspection5/11/20095/11/20095/13/2009 4:49:33 PMPFAIL
Net con rating is not sufficient, functionality tested okay, junction boxes need covered.
FIR04-00069 INSP-Final Inspection5/11/20095/11/20095/13/2009 9:26:08 AMPPASS
Dry sidewalls are installed, noted one missing escutcheon at the womens restroom-contractor to install while on site, permit okayed for final.
FIR05-00881 INSP-Final Inspection5/11/20095/11/20095/11/2009 2:49:25 PMPDONE
Discussion with contractor regarding permit status and process for void or expiration.
FIR04-00665 INSP-Final Inspection5/11/20095/11/20095/11/2009 2:46:53 PMPFAIL
No access to complete inspection.
FIR04-00624 INSP-Final Inspection5/11/20095/11/20095/11/2009 2:41:23 PMPPASS
DSW installation is finished, walkthrough completed, fire sprinkler permit finaled.
BLD09-00564 FIRE-Final Inspection5/8/20095/11/20095/11/2009 1:56:40 PMPPASS
Vanilla life safety okayed.
BLD09-00563 FIRE-Final Inspection5/8/20095/11/20095/11/2009 1:55:57 PMPPASS
Vanilla permit life safety passed.
BLD09-00391 FIRE-Final Inspection5/8/20095/11/20095/11/2009 1:55:20 PMPPASS
Vanilla life safety okayed.
BLD09-00359 FIRE-Final Inspection5/8/20095/11/20095/11/2009 1:54:54 PMPPASS
Life safety passed.
FIR09-00280 INSP-Final Inspection5/11/20095/11/20095/11/2009 1:27:28 PMPPART
Modifications at the remodeled conference room are approved for cover including minor head layout changes from what is shown on plans, noted two heads outside the conference room-one at the SE corner and one in the corridor adjacent to a new header in need of relocation due to spacing issues.
FIR09-00238 INSP-Sprinkler Rough-in/Hydro5/11/20095/11/20095/11/2009 12:35:23 PMAPART
Pendent heads at the 1st floor elevator lobby are okay for ceiling cover.
FIR09-00279 INSP-Sprinkler Rough-in5/6/20095/11/20095/11/2009 12:16:12 PMAPART
Overhead modifications at the tenant remodel per the scope of permit work are okay for cover, final pending ceiling tile and escutcheons.
BLD09-00140 FIRE-Final Inspection5/8/20095/11/20095/11/2009 11:28:09 AMAPASS
Fire life safety inspection completed satisfactory.