Inspections for the day of: Monday, May 11, 2009.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC09-00160 INSP - Stop Work Order5/11/20095/11/20095/11/2009 7:19:19 PMPFAIL
Started to clear and grub project area prior to permit being issued. Doulbe fee on ESC permit.
ESC06-01570 DOC - Permit Finaled5/11/20095/11/20095/11/2009 4:12:01 PMPPASS
ESC09-00193 Complaint Inspection5/11/20095/11/20095/11/2009 4:10:59 PMPFAIL
Correction Notice:
1. Remove all debris of stockpiles that are sitting o the property to the north of the project area.
2. Clean up all sediment and debris off of all hard surfaces on a daily basis.
Will re inspect on 5/18/09 AM.
ESC09-00223 Site Preparation ESC5/11/20095/11/20095/11/2009 2:15:24 PM NR
ESC08-00480 General Inspection5/11/20095/11/20095/11/2009 2:07:43 PM PASS
ESC08-00836 Site Preparation5/11/20095/11/20095/11/2009 1:34:53 PM FAIL
Verbal to RP:
1. Provide a concrete washout prior to the pour of any concrete.
2. install a sediement barrier along irragation canal at the east side of lot. If it is going to be piped in, contact the city over water deversion issues.
ESC07-00987 Tracking Control5/11/20095/11/20095/11/2009 1:34:52 PMAPART
On 5/12/09, a street sweeper is scheduled for sweeping of parking lot after grading is complete on the south section of the project area.
ESC09-00052 General Inspection5/7/20095/11/20095/11/2009 11:28:18 AMAPASS
ESC08-00414 General Inspection5/11/20095/11/20095/11/2009 10:50:11 AM DONE
Moved to a site final.
ESC08-00414 DOC - Permit Finaled5/11/20095/11/20095/11/2009 10:50:06 AMPPASS
ESC09-00222 Site Preparation5/7/20095/11/20095/11/2009 10:48:44 AMAPASS
ESC08-01050 Tracking Control5/7/20095/11/20095/11/2009 10:48:21 AMAPASS
ESC08-00924 Conference5/11/20095/11/20095/11/2009 10:48:09 AMADONE
Went over area of where stabiliation will be required and what areas need to be protected once fill area occurs.
ESC09-00227 Site Preparation5/11/20095/11/20095/11/2009 8:26:05 AMACANC
ESC09-00227 Site Preparation5/11/20095/11/20095/11/2009 8:25:55 AM NR