MEC11-00863
| Final | 5/10/2011 | 5/11/2011 | 5/11/2011 11:58:04 AM | A | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Debbie Marino final ok
|
MEC11-01364
| Final | 5/10/2011 | 5/11/2011 | 5/11/2011 11:09:40 AM | A | PASS |
|
|
20# test ok
|
PLM11-00797
| Sprinkler (Final) | 5/10/2011 | 5/11/2011 | 5/11/2011 10:55:17 AM | A | PASS |
|
|
Mark Phone #: ###-####
|
PLM10-02537
| Final | 5/10/2011 | 5/11/2011 | 5/11/2011 10:54:59 AM | A | PART |
|
|
ken Phone #: ###-#### just needs dcva tested
|
PLM11-00805
| Plumbing Rough-in | 5/10/2011 | 5/11/2011 | 5/11/2011 9:52:33 AM | A | PART |
|
|
JOB CONTACT IS NATE ###-#### Phone #: ###-#### >> Inspection requested via web by MARGGIE BUSS conference,, basement drainage for equipment must be piped to indirect waste receptor with sealed and vented sump. remove R.P. in the crawl space. floor sinks under treatment sinks must not be enclosed in cabinets. DCVA required on sprinkler in bottle storage room.
|