FIR10-00583
| INSP-Sprinkler Rough-in | 5/11/2011 | 5/11/2011 | 5/11/2011 4:10:17 PM | A | PART |
|
|
UG fire supply line approved for bury- see dated red line annotations on stamped plan set. NOTE: Two 90 deg. ells as shown on plans have been replaced with 45's. Also noted a restrained joint system at the last piece of pipe to the in building ductile riser per NFPA 13 2007 10.8.3 (1) (2) has been used in place of thrust blocking per drawings.
|
BLD10-00043
| FIRE-Conference | 5/10/2011 | 5/11/2011 | 5/11/2011 4:01:58 PM | A | DONE |
|
|
On site conference with contractor regarding fire protection at the tape room and IFC 2006 and 2009 sec. 903.3.1.1, 903.3.1.1.1 (1)-(4/5) and 904.2.
|
FIR10-00659
| INSP-Sprinkler Rough-in/Hydro | 5/10/2011 | 5/11/2011 | 5/11/2011 6:59:34 AM | A | CANC |
|
|
inspection for UG. please call Trent at ###-#### one hr before inspection. Phone #: ###-#### >> Inspection requested via web by Trent Bice Inspection cancelled from web by: Trent Bice
|
FIR10-00659
| INSP-Sprinkler Rough-in | 5/10/2011 | 5/11/2011 | 5/11/2011 6:59:31 AM | A | CANC |
|
|
request inspection for domestic water line @ same time of UG inspection. Please call Trent @ ###-#### one hr before inspection time. Phone #: ###-#### >> Inspection requested via web by Trent Bice Inspection cancelled from web by: Trent Bice
|