BLD11-00061
| BLD-Conference | 5/11/2011 | 5/11/2011 | 5/12/2011 4:45:41 AM | P | DONE |
|
|
trent Phone #: ###-#### talked about chimney they want to transition from the masonry to a triple wall flue pipe in the attic the fire place will now be a gas log set I oked this but told them this will need to be oked with mec inspector as for the gas log and venting is a mec issue
|
BLD10-02578
| BLD-Final | 5/11/2011 | 5/11/2011 | 5/12/2011 4:27:12 AM | P | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Braxton Hansen
|
ESC10-00828
| Site Final | 5/11/2011 | 5/11/2011 | 5/12/2011 4:26:43 AM | P | FAIL |
|
|
needs to land scape lot
|
BLD09-00672
| BLD-Final | 5/9/2011 | 5/11/2011 | 5/12/2011 4:26:02 AM | A | FAIL |
|
|
JEFF PLEASE CALL 30 MIN BEFORE GOING OUT Phone #: ###-#### needs hand rail and landing out side of man door
|
GCB10-00084
| GCB-Footing | 5/10/2011 | 5/11/2011 | 5/12/2011 4:25:09 AM | A | CANC |
|
|
FootingsRyan @ ###-####Call in advance to verify Floodplain Elevation issues have been addressed.
|
GCB10-00044
| GCB-Final | 5/10/2011 | 5/11/2011 | 5/12/2011 4:24:49 AM | A | PASS |
|
|
FinalDaniel @ ###-####Call in advance
|