Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR12-00229 INSP-Sprinkler Rough-in/Hydro5/11/20125/11/20125/11/2012 4:00:36 PMPPART
Project was not ready for hydro test but the sprinkler rough-in passed.
FIR12-00218 INSP-Conference5/11/20125/11/20125/11/2012 3:16:15 PMPDONE
Brodie and I discussed what was needed on the as-builts and were to leave them for me.
BLD11-01192 FIRE-Final Inspection5/10/20125/11/20125/11/2012 2:25:18 PMAPASS
Life safety passed
BLD12-00442 FIRE-Final Inspection5/10/20125/11/20125/11/2012 10:56:56 AMAPASS
Life safety passed.
BLD11-01512 FIRE-Final Inspection5/10/20125/11/20125/11/2012 9:32:08 AMAPASS