ELE13-00942
| ELE-Aging Inspection | 5/11/2015 | 5/11/2015 | 5/12/2015 10:19:27 AM | | DONE |
|
|
still under construction
|
ELE14-01066
| Electrical Rough-In | 5/8/2015 | 5/11/2015 | 5/11/2015 3:51:05 PM | P | PASS |
|
|
Rough in inspection H 1st floor rooms H103, H104, H159, H160. Building permit number BLD13-00184. Call Lonny when on site. Thanks. Phone #: ###-#### Inspection requested via web by Lonny Baum ok cover as requested
|
ELE14-01814
| Final | 5/9/2015 | 5/11/2015 | 5/11/2015 3:33:01 PM | P | PART |
|
|
Final electrical inspection IL 1st floor area C rooms C105, C106, C107, C108, C109, and C110. Building permit number BLD13-00182. Call Lonny when on site. Thanks. Phone #: ###-#### Inspection requested via web by Lonny Baum rooms listed ok final
|
ELE15-01359
| Final | 5/8/2015 | 5/11/2015 | 5/11/2015 2:23:57 PM | P | CANC |
|
|
Contact: Dawn Wirz (owner) Please call before going. Phone #: ###-#### Inspection requested via web by Deb Gooden see ri
|
ELE15-01359
| Electrical Rough-In | 5/11/2015 | 5/11/2015 | 5/11/2015 2:23:25 PM | P | PASS |
|
|
Contact: Dawn Wirz (owner) Please call before going. Phone #: ###-#### Inspection requested via web by Deb Gooden circuit additions only ok, will final after remote shed done
|
ELE15-01168
| Final | 5/11/2015 | 5/11/2015 | 5/11/2015 2:09:21 PM | P | CANC |
|
|
Rae Phone #: ###-#### see final later, see rip
|
ELE15-01168
| Rough-In Permanent Service | 5/11/2015 | 5/11/2015 | 5/11/2015 2:07:56 PM | P | PASS |
|
|
Rae Phone #: ###-#### ri ok, ok cover u/g, p/s o/h rec ok
|
ELE15-01365
| Electrical Rough-In | 5/11/2015 | 5/11/2015 | 5/11/2015 1:32:59 PM | P | PASS |
|
|
Call Steve when in route. Check in with security at front desk. Phone #: ###-#### Inspection requested via web by Steve McCloy ok cover perimeter borders and walls only
|
ELE15-01363
| Rough-In Permanent Service | 5/11/2015 | 5/11/2015 | 5/11/2015 1:06:41 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by kevin blackmon ri ok, p/s u/g n ok
|
ELE15-00724
| Electrical Rough-In | 5/11/2015 | 5/11/2015 | 5/11/2015 11:51:01 AM | P | PASS |
|
|
Floor heat Master bedroom; Jason Phone #: ###-#### ok cover floor heat only
|
ELE15-01328
| Conference | 5/8/2015 | 5/11/2015 | 5/11/2015 10:47:58 AM | A | DONE |
|
|
would like call 30min ahead; Evon Phone #: ###-#### talked about wiring bath upstairs, code items like free length, 1 1/4", circuits, spacing outlets, when to call for inspections
|
ELE15-01349
| Temporary Service | 5/11/2015 | 5/11/2015 | 5/11/2015 9:38:40 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Greg Traudt t/s u/g n ok
|
ELE15-00784
| Final | 5/8/2015 | 5/11/2015 | 5/11/2015 9:00:39 AM | A | PASS |
|
|
This is just the circuit for a potential solar installation in the future. There is a jbox in the attic, below the south facing roof of the garage where the solar would go. From there a single home run in conduit runs back to the knife switch located next to the meter base. And from the knife switch the breaker in panel A, at the bottom of the bussing, opposite the feeder lugs. There is a lightning ground, that runs along side the solar conduit that is connected to the service electrode under the main panels in the garage. Thanks again Phone #: ###-#### Inspection requested via web by Ryan King ok final
|
ELE15-01189
| Rough-In Permanent Service | 5/8/2015 | 5/11/2015 | 5/11/2015 8:16:34 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Bob Glenn ri ok, p/s u/g n ok
|