BLD15-04318
| FIRE-Final Inspection | 5/11/2016 | 5/11/2016 | 5/11/2016 2:55:32 PM | P | PASS |
|
|
No fire sprinklers, commercial hood suppression system inspection complete (FIR16-00148), fire alarm inspection complete (FIR16-00144) , fire extinguishers are in place with current inspection tags. Final life fire safety inspection passed/complete.
|
FIR16-00144
| INSP-Final Inspection | 5/10/2016 | 5/11/2016 | 5/11/2016 2:53:26 PM | P | PASS |
|
|
Final fire alarm inspection passed/complete.
|
FIR16-00148
| INSP-Final Inspection | 5/9/2016 | 5/11/2016 | 5/11/2016 2:51:21 PM | P | PASS |
|
|
Final commercial hood fire suppression system inspection passed/complete.
|
FIR16-00290
| INSP-Sprinkler Rough-in | 5/11/2016 | 5/11/2016 | 5/11/2016 12:42:21 PM | P | PASS |
|
|
Rough to cover inspection for overhead fire sprinkler piping located above hardlids complete, fire sprinkler piping above hardlids approved for cover.
|
FIR16-00278
| INSP-Sprinkler Rough-in | 5/10/2016 | 5/11/2016 | 5/11/2016 12:38:04 PM | P | PASS |
|
|
Rough to cover inspection for fire sprinkler piping above suspended ceilings complete, overhead fire sprinkler piping located above suspended ceilings approved for cover.
|
FIR16-00028
| INSP-Sprinkler Rough-in | 5/10/2016 | 5/11/2016 | 5/11/2016 12:35:46 PM | A | PART |
|
|
Tenting inspection for level 4 complete, overhead fire sprinkler approved for cover on level 4 with exception to the fire sprinkler piping crossing the breezeway, this piping cannot be covered (as well as levels 1,2 and 3) until an acceptable means of keeping the pipe from freezing is inspected and passed.. Tenting for sprinkler piping in attic space on level 3 still not installed, overhead fire sprinkler piping in attic space on level 3 not approved for cover.
|
BLD16-00127
| FIRE-Conference | 5/11/2016 | 5/11/2016 | 5/11/2016 10:39:04 AM | P | DONE |
|
|
Fire conference complete
|
FIR16-00038
| INSP-Final Inspection | 5/10/2016 | 5/11/2016 | 5/11/2016 10:02:02 AM | P | PASS |
|
|
Final fire sprinkler nspection passed/complete
|
FIR15-00602
| INSP-Sprinkler Rough-in/Hydro | 5/10/2016 | 5/11/2016 | 5/11/2016 9:37:04 AM | A | PASS |
|
|
Northwest underground supply hydrostatic test complete, this completes underground hydrostatic tests.
|
FIR15-00767
| INSP-Final Inspection | 5/10/2016 | 5/11/2016 | 5/11/2016 9:13:45 AM | A | PART |
|
|
Project is being worked in phases, contractor is going floor by floor for partial inspection and a final alarm inspection for entire building at project completion. Inspected level 3 smoke detectors and pull stations, remaining detection on level 3 is VESDA systems which will be tested at a later date. Level 1 smoke detectors/duct detectors/pull stations spot checked, devices tested operated correctly. Level 1 inspection complete, partial completion for level 3, contractor will schedule inspection request when other area's are ready.
|
BLD16-00762
| FIRE-Final Inspection | 5/10/2016 | 5/11/2016 | 5/11/2016 12:00:00 AM | P | CANC |
|
|
Joey Phone #: ###-####
|